Difference between revisions of "Run Planning Meeting Notes, Feb 12-Feb 28, 2018"

From GlueXWiki
Jump to: navigation, search
(Sunday, February 25)
(Sunday, February 25)
Line 65: Line 65:
 
#* [https://logbooks.jlab.org/entry/3537873 Missing channels on Tagger Miscrope]?
 
#* [https://logbooks.jlab.org/entry/3537873 Missing channels on Tagger Miscrope]?
 
#* [https://logbooks.jlab.org/entry/3537996 FDC Occupancy plots]
 
#* [https://logbooks.jlab.org/entry/3537996 FDC Occupancy plots]
#* [https://logbooks.jlab.org/entry/3537357 3min oscillations]
+
#* [https://logbooks.jlab.org/entry/3537357 energy oscillations]
 
#* [https://logbooks.jlab.org/entry/3538196 Low level monitoring]
 
#* [https://logbooks.jlab.org/entry/3538196 Low level monitoring]
 
#* [https://logbooks.jlab.org/entry/3537936 rootspy causes log out of hdops]
 
#* [https://logbooks.jlab.org/entry/3537936 rootspy causes log out of hdops]

Revision as of 10:40, 25 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 22

  1. Notes from the previous 24 hours:
    • Continued production data until 1:30pm
    • Secretary Perry toured Hall D
    • Beam delivery shaky: Swing shift summary
    • DAQ/cMesg/rootSPY issues
    • Dipole trip
    • Transmission looks ok
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan once beam returns
    • Production data

Friday, February 23

  1. Notes from the previous 24 hours:
    • Production data
    • Beam taken away 11:15-14:14 for linac issues
    • Owl Shift Summary: rho, omega, phi triggers
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data

Saturday, February 24

  • No Hall D Counting Room meeting due to Collaboration Meeting

Sunday, February 25

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • Move collimator+beam
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • CDC 160 ns shift: bring window even closer, narrow its width? Revert to CDC integral mode.
    • MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning
    • Production data

Monday, February 26

  1. Notes from the previous 24 hours:


Tuesday, February 27

  1. Notes from the previous 24 hours:


Wednesday, February 28

  1. Notes from the previous 24 hours: