Difference between revisions of "Run Planning Meeting Notes, Feb 12-Feb 28, 2018"

From GlueXWiki
Jump to: navigation, search
(Monday, February 26)
(Monday, February 26)
Line 105: Line 105:
 
#* Harp scan in early morning: [https://logbooks.jlab.org/entry/3538262 yesterday's scan]
 
#* Harp scan in early morning: [https://logbooks.jlab.org/entry/3538262 yesterday's scan]
 
#* Production data (until 1pm)
 
#* Production data (until 1pm)
#* Elton walk through in Hall D and Tagger Hall.
+
#* During Optics studies (1-3pm)
#* MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
+
#**Elton walk through in Hall D and Tagger Hall.
#* FCAL bases
+
#** MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
 +
#** FCAL bases
 
#* Production data
 
#* Production data
  

Revision as of 09:36, 26 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 22

  1. Notes from the previous 24 hours:
    • Continued production data until 1:30pm
    • Secretary Perry toured Hall D
    • Beam delivery shaky: Swing shift summary
    • DAQ/cMesg/rootSPY issues
    • Dipole trip
    • Transmission looks ok
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan once beam returns
    • Production data

Friday, February 23

  1. Notes from the previous 24 hours:
    • Production data
    • Beam taken away 11:15-14:14 for linac issues
    • Owl Shift Summary: rho, omega, phi triggers
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data

Saturday, February 24

  • No Hall D Counting Room meeting due to Collaboration Meeting

Sunday, February 25

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • Move collimator+beam
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • CDC 160 ns shift: bring window even closer, narrow its width? Revert to CDC integral mode.
    • MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning: does not look good
    • Production data
    • Harp (around noon)
    • Special CDC run on diamond at 100nA for 30 min (Naomi will analyze)
    • Put profiler in to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes)
    • Move collimator (Hovanes)
    • PS scalers check (Sasha)
    • Change CDC to integral mode and keep for rest of run (Sasha)

Monday, February 26

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • TAC plans
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning: yesterday's scan
    • Production data (until 1pm)
    • During Optics studies (1-3pm)
      • Elton walk through in Hall D and Tagger Hall.
      • MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
      • FCAL bases
    • Production data

Tuesday, February 27

  1. Notes from the previous 24 hours:


Wednesday, February 28

  1. Notes from the previous 24 hours: