Run Planning Meeting Notes, Feb 12-Feb 28, 2018

From GlueXWiki
Revision as of 22:27, 24 February 2018 by Zisis (Talk | contribs) (Sunday, February 25)

Jump to: navigation, search

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 22

  1. Notes from the previous 24 hours:
    • Continued production data until 1:30pm
    • Secretary Perry toured Hall D
    • Beam delivery shaky: Swing shift summary
    • DAQ/cMesg/rootSPY issues
    • Dipole trip
    • Transmission looks ok
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan once beam returns
    • Production data

Friday, February 23

  1. Notes from the previous 24 hours:
    • Production data
    • Beam taken away 11:15-14:14 for linac issues
    • Owl Shift Summary: rho, omega, phi triggers
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data

Saturday, February 24

  • No Hall D Counting Room meeting due to Collaboration Meeting

Sunday, February 25

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • Move collimator+beam
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • CDC window: bring even closer to begining, narrow its width?
    • Revert to CDC integral mode: when?
    • Check MWPC noise with FCAL monitoring system off.
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning
    • Production data

Monday, February 26

  1. Notes from the previous 24 hours:


Tuesday, February 27

  1. Notes from the previous 24 hours:


Wednesday, February 28

  1. Notes from the previous 24 hours: