Difference between revisions of "Run Planning Meeting Notes, Feb 14 - Feb 20, 2019"
From GlueXWiki
(→Wednesday, Feb. 18 at 08:45) |
|||
Line 7: | Line 7: | ||
#* HI test on Sunday: for most of the day, we were the only hall up. | #* HI test on Sunday: for most of the day, we were the only hall up. | ||
#** ToF inner layer off, DC HV reduced, Tpol excluded from the trigger. | #** ToF inner layer off, DC HV reduced, Tpol excluded from the trigger. | ||
+ | #** DIRC and DAQ passed the test! | ||
#* Overnight: smooth 425nA scanning operation. | #* Overnight: smooth 425nA scanning operation. | ||
# Monitoring | # Monitoring |
Revision as of 08:42, 18 February 2019
Wednesday, Feb. 18 at 08:45
- Over the weekend summary:
- Quote by Eugine: "All the problems landed on other ppl's court".
- DIRC SSP firmware on Friday (thanks to Ben and Sasha)
- Low intensity program completed.
- HV scan: two more settings remains
- HI test on Sunday: for most of the day, we were the only hall up.
- ToF inner layer off, DC HV reduced, Tpol excluded from the trigger.
- DIRC and DAQ passed the test!
- Overnight: smooth 425nA scanning operation.
- Monitoring
- Plan for today:
- Hall A, B and C are down, another HI test? @900nA?
- Issues:
- hdview2: hang on the 1st event
- DAQ: Randy factor cant be set and BCALroc.
- Any update on the RF issue?
- Transition to the CPP