(Wednesday, Feb. 18 at 08:45)
Line 7: Line 7:
 
#* HI test on Sunday: for most of the day, we were the only hall up.
 
#* HI test on Sunday: for most of the day, we were the only hall up.
 
#** ToF inner layer off, DC HV reduced, Tpol excluded from the trigger.
 
#** ToF inner layer off, DC HV reduced, Tpol excluded from the trigger.
 +
#** DIRC and DAQ passed the test!
 
#* Overnight: smooth 425nA scanning operation.
 
#* Overnight: smooth 425nA scanning operation.
 
# Monitoring
 
# Monitoring

Revision as of 09:42, 18 February 2019

Wednesday, Feb. 18 at 08:45

  1. Over the weekend summary:
    • Quote by Eugine: "All the problems landed on other ppl's court".
    • DIRC SSP firmware on Friday (thanks to Ben and Sasha)
    • Low intensity program completed.
    • HV scan: two more settings remains
    • HI test on Sunday: for most of the day, we were the only hall up.
      • ToF inner layer off, DC HV reduced, Tpol excluded from the trigger.
      • DIRC and DAQ passed the test!
    • Overnight: smooth 425nA scanning operation.
  2. Monitoring
  3. Plan for today:
    • Hall A, B and C are down, another HI test? @900nA?
  4. Issues:
    • hdview2: hang on the 1st event
    • DAQ: Randy factor cant be set and BCALroc.
    • Any update on the RF issue?
  5. Transition to the CPP