(Created page with "== Wednesday, Feb. 13 at 08:45 == # Notes from the past 24 hours: #*Investigations of SSP problem #**40 min access for SSP issue. Sergei also looked at TOF RF problem, and Lu...")
 
(Wednesday, Feb. 13 at 08:45)
Line 1: Line 1:
== Wednesday, Feb. 13 at 08:45 ==
+
== Wednesday, Feb. 18 at 08:45 ==
# Notes from the past 24 hours:
+
# Over the weekend summary:
#*Investigations of SSP problem
+
#* DIRC SSP firmware
#**40 min access for SSP issue. Sergei also looked at TOF RF problem, and Lubomir worked on TRD.
+
 
#**[https://logbooks.jlab.org/entry/3652012 Some success in identifying issue and partly fixing it]
+
 
#**[https://logbooks.jlab.org/entry/3652330 Only one instance of lifetime dropping to zero after the fix]
+
 
#*DIRC data taking.
+
# Plan for today:
# Issues
+
#* Hall A, B and C are down, another HI test? @900nA?
#*Beam stirring issue. MCC cannot deliver more than 65 nA.
+
#** Only ran on amo since last evening.
+
#** [https://logbooks.jlab.org/entry/3652433 Beam transmission look fine]
+
#*[https://logbooks.jlab.org/entry/3651965 Beam convergence]
+
#*SSP problem
+
#*[https://logbooks.jlab.org/entry/3651748], [https://logbooks.jlab.org/entry/3651772] Target control problem. [https://logbooks.jlab.org/entry/3651725 Target alarms were not enabled].
+
#*TOF RF status?
+
#*Beam current can drift by have been drifting by up to 15 MeV the last 24h
+
#Today's plan (changed this morning at the 8:00am MCC meeting)
+
#*Beam scheduled for all day: DIRC commissioning+Thr. scan (LED&dark runs done) + data taking overnight.
+
#*[https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
+
#*[https://halldweb.jlab.org/wiki/images/6/64/Spring19_week1.jpg This week time chart]
+
#*[https://halldweb.jlab.org/online/whiteboard/ Hall D white board]
+

Revision as of 09:32, 18 February 2019

Wednesday, Feb. 18 at 08:45

  1. Over the weekend summary:
    • DIRC SSP firmware


  1. Plan for today:
    • Hall A, B and C are down, another HI test? @900nA?