Difference between revisions of "Run Planning Meeting Notes, Feb 15-Feb 21, 2018"
From GlueXWiki
(Created page with "<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] * [h...") |
(No difference)
|
Revision as of 20:35, 14 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, February 15
- Notes from the previous 24 hours:
- Controlled Access
- Hovanes put lead on the beam profiler for the v-wire study
- Colin and Matt replaced FCAL bases
- Lubomir went in for the FDC
- (in the evening) Alex B. went in to swap voltage adapters for the active collimator
- Hovanes made a V-wire study
- Todd tried to improve beam optics but resulted in no change
- Sergey and the DAQ group high intensity studies
- Controlled Access
- Issues:
- Today's run plan Google Calendar:
- Reports (?):
- Standing issues: