Difference between revisions of "Run Planning Meeting Notes, Feb 15-Feb 21, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, February 16)
Line 14: Line 14:
 
#** The muon chamber steel plate was moved behind the detector
 
#** The muon chamber steel plate was moved behind the detector
 
#** [https://logbooks.jlab.org/entry/3532483 Alex B. went in to adjust active collimator baselines for multiple gain settings]
 
#** [https://logbooks.jlab.org/entry/3532483 Alex B. went in to adjust active collimator baselines for multiple gain settings]
#* Active collimator scans ?
+
#* Production data started around 2:30am
#* Sasha trigger study ?
+
#* Accelerator still having trouble delivering desired beam to all halls.
#* Production data overnight ?
+
#** Halls A and C are a factor of 3 lower in beam current
 +
#** Accelerator is discussing options which might involve beam going away
 
# Issues:
 
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3532858 Harp scan results still not great]
 +
#* [https://logbooks.jlab.org/entry/3532831 PS rate dropped overnight]
 
# Reports (?):
 
# Reports (?):
 
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics]
 +
#* [https://logbooks.jlab.org/entry/3532786 Monitoring]
 
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
#* Harp scan at 7am
+
#* Ask for improvement in the harp scan
#** Empty target while taking harp scans
+
#* Continue production data?
#* Empty target run (1 hr)
+
#* Low intensity running?
#* Raw mode while filling target
+
#* AC scans?
#* Very low / very very low intensity run
+
#* Sasha trigger tests?
 
# Weekend meeting
 
# Weekend meeting
 
#* What day and time?
 
#* What day and time?

Revision as of 09:27, 16 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, February 16

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Ask for improvement in the harp scan
    • Continue production data?
    • Low intensity running?
    • AC scans?
    • Sasha trigger tests?
  5. Weekend meeting
    • What day and time?

Thursday, February 15

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Google Calendar:
    • Accelerator down 4hr for "restoring corners" starting around 9am.
    • Hall B Mott will be invasive, likely a couple hours without beam
    • Controlled access during accelerator downtime
      • Muon chamber work
      • FCAL?
      • Anyone else?
    • Harp scan once beam returns
    • AC scans
    • Sasha trigger study