(Friday, February 16)
(Friday, February 16)
Line 12: Line 12:
 
#* Controlled Access
 
#* Controlled Access
 
#** [https://logbooks.jlab.org/entry/3532443 Colin replaced FCAL bases]
 
#** [https://logbooks.jlab.org/entry/3532443 Colin replaced FCAL bases]
#** The muon chamber steel plate was moved behind the detector
+
#** [https://logbooks.jlab.org/entry/3532513 The muon chamber steel plate was moved behind the detector]
 
#** [https://logbooks.jlab.org/entry/3532483 Alex B. went in to adjust active collimator baselines for multiple gain settings]
 
#** [https://logbooks.jlab.org/entry/3532483 Alex B. went in to adjust active collimator baselines for multiple gain settings]
 
#* Production data started around 2:30am
 
#* Production data started around 2:30am

Revision as of 09:27, 16 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, February 16

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Ask for improvement in the harp scan
    • Continue production data?
    • Low intensity running?
    • AC scans?
    • Sasha trigger tests?
  5. Weekend meeting
    • What day and time?

Thursday, February 15

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports (?):
  4. Today's run plan Google Calendar:
    • Accelerator down 4hr for "restoring corners" starting around 9am.
    • Hall B Mott will be invasive, likely a couple hours without beam
    • Controlled access during accelerator downtime
      • Muon chamber work
      • FCAL?
      • Anyone else?
    • Harp scan once beam returns
    • AC scans
    • Sasha trigger study