==Wednesday, February  22 ==
 +
# Accelerator Status over the last 24 hrs
 +
#* We got beam back at 5pm after beam studies
 +
#* Hall D switched from zero crossing to RF extracted [https://logbooks.jlab.org/entry/3460987] [https://logbooks.jlab.org/entry/3460994]
 +
#* No downtime incidents of more than 30 minutes after 8 hrs of beam studies
 +
#* Harp scans: [https://logbooks.jlab.org/entry/3461066 5C11](MCC), [https://logbooks.jlab.org/entry/3461067 5C11B](MCC), [https://logbooks.jlab.org/entry/3461084 Radiator]
 +
#** (Sigma_X,Sigma_Y) for this scan: (1.10, 0.39), (0.87, 0.20), (0.76, 0.12)
 +
#** Previous scan from Feb 18:  (0.88, 0.37), (0.71, 0.28), and (0.60, 0.18).
 +
#** Beam becomes wider in X and narrower in Y
 +
#** [https://logbooks.jlab.org/entry/3461097 Analysis of the latest scan] by Hovanes
 +
# Hall-D/GlueX items
 +
#* In the last 24 hours:
 +
#** ABU 12.37 hrs (1.5 + 4.53 + 6.34), BANU 1.53 hrs (0.17 + 0.82 + 0.54)
 +
#** Total triggers collected:  1084 M
 +
#* Alex B. did [https://logbooks.jlab.org/entry/3461088 TAGM dark rates] study
 +
#* 1 hour (33M) empty target run, and 0.5hrs of run with target being filled
 +
# Issues
 +
#* Program crashes/restarts:
 +
#** DAQ - 2 (0 + [https://logbooks.jlab.org/entry/3461161 1] + 1);
 +
#** RootSpy - 1 ([https://logbooks.jlab.org/entry/3461181 1] + 0 + 0)
 +
#** elog and shift checklist were down for 2 hours tonight [https://logbooks.jlab.org/entry/3461227]
 +
#** gluon01 hanging on shift checklist print [https://logbooks.jlab.org/entry/3461192]
 +
# Monitoring
 +
#* [https://logbooks.jlab.org/entry/3461186 Trig4:PS]
 +
#* [https://logbooks.jlab.org/entry/3461238 Low level monitoring report]
 +
# Run Plan
 +
#* Production
 +
#* Trigger studies?
 +
#* Hall A bleadthrough measurement
 +
# Offline Analysis?
 +
#* [https://logbooks.jlab.org/entry/3460909 FCAL calibration]
 +
#* [https://logbooks.jlab.org/entry/3461002 Beam energy so far]
 +
#* [https://logbooks.jlab.org/entry/3461150 Beam trip map for reconstruction]
 +
#* [https://logbooks.jlab.org/entry/3461133 Comparison of 100nA/150nA reconstruction]
 +
# Any Other Business?
 +
 +
 +
==Tuesday, February  21 ==
 +
# Accelerator Status over the last 24 hrs
 +
#* Beam was stable when available, with some X variations at AD00C [https://logbooks.jlab.org/entry/3460753]
 +
#** MCC did pathlength checks [https://logbooks.jlab.org/entry/3460807]
 +
#** NOTE: PSC coincidence with amorphous is ~1,400 while it is ~2,300 with a diamond
 +
#** 1 downtime incident of more than 30 minutes:
 +
#*** Energy change in SL, failed controls on 2L21-6 (2 hrs 20 min) [https://logbooks.jlab.org/entry/3460784]
 +
#* Beam studies today from 9 AM to 5 PM
 +
#** No Hall access during beam studies
 +
#** Our target will be emptied
 +
#* Harp scan on Saturday:
 +
# Hall-D/GlueX items
 +
#* In the last 24 hours:
 +
#** ABU 15.25 hrs (5.69 + 6.08 + 3.48), BANU 2.91 hrs (1.55 + 0.90 + 0.46)
 +
#** Total triggers collected: 1650 M
 +
#* [https://logbooks.jlab.org/entry/3460609 Solenoid Nitrogen liquid level alarm]
 +
#* [https://logbooks.jlab.org/entry/3460775 Upper bubbler is nearing its low level]
 +
#* [https://logbooks.jlab.org/entry/3460809 Prolonged FDC voltage alarm]
 +
#* 2 additional parasitic TRD runs.
 +
# Issues
 +
#* Program crashes/restarts: DAQ - 4 (3 + 1 + 0); RootSpy - 1 (0 + 0 + 1)
 +
# Monitoring
 +
#* Reinstalled PS reference plot [https://logbooks.jlab.org/entry/3460545]
 +
#* Do we need different reference plots for amorphous runs? [https://logbooks.jlab.org/entry/3460564] [https://logbooks.jlab.org/entry/3460557]
 +
#* [https://logbooks.jlab.org/entry/3460860 Low level monitoring report]
 +
# Run Plan
 +
#* Production until beam studies start
 +
#* Start emptying the target
 +
#* Harp scans upon return of the beam
 +
#* Empty target run (1 hour)
 +
#* A special run with target being filled
 +
#* And back to production...
 +
#* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run#Runplan_time_charts Run Plan]
 +
# Offline Analysis?
 +
#* [https://logbooks.jlab.org/entry/3460695 F1TDC shift study]
 +
# Any Other Business?
 +
 +
 +
==Monday, February  20 ==
 +
# Accelerator Status over the last 48 hrs
 +
#* Beam was mostly stable but with some increase in trip frequency [https://logbooks.jlab.org/entry/3460400] [https://logbooks.jlab.org/entry/3460070]
 +
#** Apparently, to turn on/off Hall A beam, our beam has to be taken down as well for a few minutes
 +
#** 2 downtime incidents of more than 30 minutes on Saturday:
 +
#*** Continuation of 1L23 issue Sat morning (1.5 hrs) [https://logbooks.jlab.org/entry/3459691]
 +
#*** Work on 5th pass separator on Sat (42min) [https://logbooks.jlab.org/entry/3459780]
 +
#** No significant accelerator downtime on Sunday
 +
#* Beam studies tomorrow: either 9:00-14:00, or 14:00-17:00
 +
#* Harp scan on Saturday:
 +
#** MCC scans at [https://logbooks.jlab.org/entry/3459713 5C11] and [https://logbooks.jlab.org/entry/3459717 5C11B] and our scan at [https://logbooks.jlab.org/entry/3459721 radiator]
 +
#*** (Sigma_X, Sigma_Y) is (0.88, 0.37), (0.71, 0.28), and (0.60, 0.18). This is consistent with the previous scan 2 days ago.
 +
# Hall-D/GlueX items
 +
#* In the last 48 hours:
 +
#** Feb 18: ABU 14.60 hrs (2.74 + 6.11 + 5.76), BANU 3.24 hrs (2.05 + 0.74 + 0.45)
 +
#** Feb 19: ABU 18.22 hrs (5.92 + 6.06 + 6.24), BANU 2.42 hrs (0.70 + 0.83 + 0.89)
 +
#** Feb 18: Total triggers collected: 1648 M
 +
#** Feb 19: Total triggers collected: 1720 M
 +
#* 2 parasitic TRD runs have been taken with different radiators.
 +
#* Trigger studies were performed by Sascha both on Saturday and Sunday
 +
# Issues
 +
#* Once, the goniometer got stuck moving, and Hovanes had to fix it [https://logbooks.jlab.org/entry/3459894]
 +
#* May be, related to the above - "unknown" diamond orientation [https://logbooks.jlab.org/entry/3460453]
 +
#* Puzzling CSS problem with TOF FADC scalers: [https://logbooks.jlab.org/entry/3460447]
 +
#* RootSpy issues:
 +
#** "Reset" did not reset all histograms [https://logbooks.jlab.org/entry/3459921] [https://logbooks.jlab.org/entry/3459926] - Fixed by David
 +
#** No reset of normalization for pi0 plot at "reset" [https://logbooks.jlab.org/entry/3459948] - Fixed by David
 +
#** Run number on the HDMONITOR elog plots [https://logbooks.jlab.org/book/hdmonitor] is getting stuck sometimes [https://logbooks.jlab.org/entry/3460032]
 +
#*** Run number is now printed on the plots
 +
#* DAQ issues:
 +
#** Zero counting rate for some ROCs [https://logbooks.jlab.org/entry/3460034] while occupancy plots are normal
 +
#** Sergey did ~30 min of DAQ testing during on Saturday
 +
# Monitoring
 +
#* New PSC reference plot [https://logbooks.jlab.org/entry/3459853] [https://logbooks.jlab.org/entry/3460014]
 +
#* New FDC reference plot [https://logbooks.jlab.org/entry/3460009]
 +
#* New holes in FCAL occupancy [https://logbooks.jlab.org/entry/3460016]
 +
#* [https://logbooks.jlab.org/entry/3460112 Low level monitoring report] (Feb 19)
 +
#* [https://logbooks.jlab.org/entry/3460499 Low level monitoring report] (Feb 20)
 +
# Run Plan
 +
#* Production, production, production...
 +
#* Do we need an empty target run on Tuesday?
 +
# Offline Analysis?
 +
#* [https://logbooks.jlab.org/entry/3460485 Beam p measurements from MCC]
 +
#* [https://logbooks.jlab.org/entry/3459758 Update on preliminary flux estimate]
 +
#* [https://logbooks.jlab.org/entry/3460002 Reconstructed particle parameters vs. run]
 +
# Any Other Business?
 +
 +
 +
==Saturday, February  18==
 +
# Accelerator Status
 +
#* Beam was mostly stable in the last 24 hrs [https://logbooks.jlab.org/entry/3459587]
 +
#** 4 downtime incidents of more than 30 minutes (and a few <10 minutes):
 +
#*** Hall A setup (30min at 4PM)
 +
#*** Hall D Orbit Drifted (37min at 6PM) [https://logbooks.jlab.org/entry/3459439]
 +
#*** Optics check to clear 1S00 trips (32min at 4AM) [https://logbooks.jlab.org/entry/3459607]
 +
#*** 1L23 (ongoing since 6:35 AM) [https://logbooks.jlab.org/entry/3459661]
 +
#* BPM calibration
 +
#** All 6 BPMs are now in sync with each other! [https://logbooks.jlab.org/entry/3459217] [https://logbooks.jlab.org/files/2017/02/3459424/css_2_17_swing.png]
 +
# Hall-D/GlueX items
 +
#* In the last 24 hours:
 +
#** ABU 16.73 hrs (5.80 + 5.32 + 5.61), BANU  1.73 hrs (0.28 + 0.72 + 0.73)
 +
#** Total triggers collected: 1813 M
 +
#* Better settings for [https://logbooks.jlab.org/entry/3459291 JTV 7 Nitrogen supply valve]
 +
#* Oscillating target pressure? [https://logbooks.jlab.org/entry/3459592]
 +
#* Progress on fixing random 32ns shift of TDC times [https://logbooks.jlab.org/entry/3459116]
 +
#* Software issues:
 +
#** Trouble starting Event Viewer [https://logbooks.jlab.org/entry/3459155]
 +
#** CSS was unavailable for about 1 hour (network problem?) [https://logbooks.jlab.org/entry/3459165] [https://logbooks.jlab.org/entry/3459179]
 +
#** RootSpy twice went down in an unusual mode:
 +
#*** first, for 40 minutes at 11 AM [https://logbooks.jlab.org/entry/3459186]
 +
#*** and from about 1 AM to 6 AM due to stalled gluon118
 +
#*** plus a few restarts in accordance with standard prescriptions
 +
#*** In 3 runs in a row, reconstruction efficiency was 20%, 30%, 50% of the template [https://logbooks.jlab.org/entry/3459308]
 +
#** 3 latest shift summary reports mention DAQ reboots only 2 times! Unbelievable!!!
 +
# Monitoring
 +
#* [https://logbooks.jlab.org/entry/3459668 low level monitoring report]
 +
# Run Plan
 +
#* Production, production, production...
 +
#* Harp scan
 +
#* Sascha's trigger studies?
 +
# Offline Analysis?
 +
#* [https://logbooks.jlab.org/entry/3459386 Beam energy so far] <br \> ''very stable around 11.650 GeV''
 +
#* [https://logbooks.jlab.org/entry/3459115 Preliminary flux estimate] <br \> From 1.0*10<sup>7</sup> to 1.2*10<sup>7</sup> for different diamond orientations at 100nA
 +
# Any Other Business?
 +
 +
 +
==Friday, February  17==
 +
# Accelerator Status
 +
#* Hall was in controlled access from 7:00 till 16:30 for RF separator studies
 +
#** Work on TRD GEM by Kondo during this time
 +
#** Alexandre has retrieved supplemental dosimetry from the tagger
 +
#** Production restarted at 17:30
 +
#* Stable beam since then (max 10 minutes off on 2 occasions) [https://logbooks.jlab.org/entry/3459080]
 +
#* Radiation levels are about the same as earlier [https://logbooks.jlab.org/entry/3458938]
 +
#* Harp scans: [https://logbooks.jlab.org/entry/3458936 MCC] and [https://logbooks.jlab.org/entry/3459009 ours].
 +
#** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
 +
#*** (0.83, 0.32), (0.63, 0.24), (0.68, ??? - the fit has failed)
 +
#*** Beam is ~20% tighter in X and '''twice narrower''' in Y comparing with a day ago
 +
#*** Photon transmission is about the same as a day ago
 +
#* BPM calibration?
 +
#** AD00 BPM is no longer the same as AD00C BCM but only 40% of it [https://logbooks.jlab.org/files/2017/02/3458969/css_2_16_swing3.png]
 +
# Hall-D/GlueX items
 +
#* In the last 24 hours:
 +
#** ABU 10.32 hrs (0 + 4.54 + 5.78), BANU 2.13 hrs (0 + 1.17 + 0.96)
 +
#** Total triggers collected: 1046 M
 +
#* The usual DAQ and RootSpy issues make shifts entertaining
 +
# Monitoring
 +
#* 32ns TDC-ADC offsets:
 +
#** rocid39 slot 13 for run 30614 [https://logbooks.jlab.org/entry/3459026]
 +
#** rocid33 slot 4 for run 30620 [https://logbooks.jlab.org/entry/3459066]
 +
#* [https://logbooks.jlab.org/entry/3459072 Low Level Monitoring Report] (today)
 +
#* [https://logbooks.jlab.org/entry/3458799 Low Level Monitoring Report] (Feb 16)
 +
# Run Plan
 +
#* Production, production, production...
 +
#* Sascha's trigger studies?
 +
# Offline Analysis?
 +
# Any Other Business?
 +
  
  
Line 10: Line 205:
 
#* Stable accelerator running over the last 24 hours
 
#* Stable accelerator running over the last 24 hours
 
#* Harp scans:
 
#* Harp scans:
#** MCC scans [https://logbooks.jlab.org/entry/3458630 before] and [https://logbooks.jlab.org/entry/3458638 after] Todd's script
+
#** MCC scans [https://logbooks.jlab.org/entry/3458630 before] and [https://logbooks.jlab.org/entry/3458638 after] Todd's script <br \>''"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."''
#***"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."
+
 
#** Our scan: [https://logbooks.jlab.org/entry/3458624 before] and [https://logbooks.jlab.org/entry/3458635 after] Todd's script
 
#** Our scan: [https://logbooks.jlab.org/entry/3458624 before] and [https://logbooks.jlab.org/entry/3458635 after] Todd's script
 
#** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
 
#** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
Line 17: Line 211:
 
#*** After  :  (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
 
#*** After  :  (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
 
#* Convergence studies from Hovanes: [https://logbooks.jlab.org/entry/3458654 Feb 15] vs [https://logbooks.jlab.org/entry/3458258 Feb 9]
 
#* Convergence studies from Hovanes: [https://logbooks.jlab.org/entry/3458654 Feb 15] vs [https://logbooks.jlab.org/entry/3458258 Feb 9]
#** Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
+
#** Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9) <br \>''"... uncertainties ...  a lot larger compared to Feb 9.  It is hard to make any conclusions about the improvement of the spot."''
#*** "... uncertainties ...  a lot larger compared to Feb 9.  It is hard to make any conclusions about the improvement of the spot."
+
#* Work on RF separation will start at 7:30 AM today and last for 2-3 hours
+
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
#*
+
#* In the last 24 hours:
 +
#** ABU 17.66 hrs (4.97 + 6.37 + 6.32), BANU 2.21 hrs (1.27 + 0.40 + 0.54)
 +
#** Total triggers collected: 1856 M
 +
#* A usual assortment of DAQ crashes
 
#* RootSpy tips:
 
#* RootSpy tips:
#** Restarting cMsg server: [https://logbooks.jlab.org/entry/3458608]
+
#** [https://logbooks.jlab.org/entry/3458608 Restarting cMsg server]
 +
#** [https://logbooks.jlab.org/entry/3458714 Multiple instances of RootSpy on gluon47] <br \>''"... no more than 1 or 2 instances running in the counting house at any point in time."''
 +
#* New BCAL gain constants in ccdb [https://logbooks.jlab.org/entry/3458716]
 
# Monitoring
 
# Monitoring
 +
#* A new instance of 32ns ADC-TDC offset: [https://logbooks.jlab.org/entry/3458781]
 
# Run Plan
 
# Run Plan
 +
#* 7:00 AM - 7:30 AM ==> Hall safety walk-through (After RADCON does it job)
 +
#* 7:30 AM - about 10 AM ==> MCC works on RF separation
 +
#* A new harp scan after RF separation work is done
 
#* Production data
 
#* Production data
#* Hall safety walk-through is supposed to happen between 7:00 AM and 7:30 AM
 
 
# Offline Analysis?
 
# Offline Analysis?
 
# Any Other Business?
 
# Any Other Business?

Latest revision as of 09:43, 22 February 2017

<- Back to Run Coordination Meetings: Spring 2017 Run


Wednesday, February 22

  1. Accelerator Status over the last 24 hrs
    • We got beam back at 5pm after beam studies
    • Hall D switched from zero crossing to RF extracted [1] [2]
    • No downtime incidents of more than 30 minutes after 8 hrs of beam studies
    • Harp scans: 5C11(MCC), 5C11B(MCC), Radiator
      • (Sigma_X,Sigma_Y) for this scan: (1.10, 0.39), (0.87, 0.20), (0.76, 0.12)
      • Previous scan from Feb 18: (0.88, 0.37), (0.71, 0.28), and (0.60, 0.18).
      • Beam becomes wider in X and narrower in Y
      • Analysis of the latest scan by Hovanes
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • ABU 12.37 hrs (1.5 + 4.53 + 6.34), BANU 1.53 hrs (0.17 + 0.82 + 0.54)
      • Total triggers collected: 1084 M
    • Alex B. did TAGM dark rates study
    • 1 hour (33M) empty target run, and 0.5hrs of run with target being filled
  3. Issues
    • Program crashes/restarts:
      • DAQ - 2 (0 + 1 + 1);
      • RootSpy - 1 (1 + 0 + 0)
      • elog and shift checklist were down for 2 hours tonight [3]
      • gluon01 hanging on shift checklist print [4]
  4. Monitoring
  5. Run Plan
    • Production
    • Trigger studies?
    • Hall A bleadthrough measurement
  6. Offline Analysis?
  7. Any Other Business?


Tuesday, February 21

  1. Accelerator Status over the last 24 hrs
    • Beam was stable when available, with some X variations at AD00C [5]
      • MCC did pathlength checks [6]
      • NOTE: PSC coincidence with amorphous is ~1,400 while it is ~2,300 with a diamond
      • 1 downtime incident of more than 30 minutes:
        • Energy change in SL, failed controls on 2L21-6 (2 hrs 20 min) [7]
    • Beam studies today from 9 AM to 5 PM
      • No Hall access during beam studies
      • Our target will be emptied
    • Harp scan on Saturday:
  2. Hall-D/GlueX items
  3. Issues
    • Program crashes/restarts: DAQ - 4 (3 + 1 + 0); RootSpy - 1 (0 + 0 + 1)
  4. Monitoring
  5. Run Plan
    • Production until beam studies start
    • Start emptying the target
    • Harp scans upon return of the beam
    • Empty target run (1 hour)
    • A special run with target being filled
    • And back to production...
    • Run Plan
  6. Offline Analysis?
  7. Any Other Business?


Monday, February 20

  1. Accelerator Status over the last 48 hrs
    • Beam was mostly stable but with some increase in trip frequency [11] [12]
      • Apparently, to turn on/off Hall A beam, our beam has to be taken down as well for a few minutes
      • 2 downtime incidents of more than 30 minutes on Saturday:
        • Continuation of 1L23 issue Sat morning (1.5 hrs) [13]
        • Work on 5th pass separator on Sat (42min) [14]
      • No significant accelerator downtime on Sunday
    • Beam studies tomorrow: either 9:00-14:00, or 14:00-17:00
    • Harp scan on Saturday:
      • MCC scans at 5C11 and 5C11B and our scan at radiator
        • (Sigma_X, Sigma_Y) is (0.88, 0.37), (0.71, 0.28), and (0.60, 0.18). This is consistent with the previous scan 2 days ago.
  2. Hall-D/GlueX items
    • In the last 48 hours:
      • Feb 18: ABU 14.60 hrs (2.74 + 6.11 + 5.76), BANU 3.24 hrs (2.05 + 0.74 + 0.45)
      • Feb 19: ABU 18.22 hrs (5.92 + 6.06 + 6.24), BANU 2.42 hrs (0.70 + 0.83 + 0.89)
      • Feb 18: Total triggers collected: 1648 M
      • Feb 19: Total triggers collected: 1720 M
    • 2 parasitic TRD runs have been taken with different radiators.
    • Trigger studies were performed by Sascha both on Saturday and Sunday
  3. Issues
    • Once, the goniometer got stuck moving, and Hovanes had to fix it [15]
    • May be, related to the above - "unknown" diamond orientation [16]
    • Puzzling CSS problem with TOF FADC scalers: [17]
    • RootSpy issues:
      • "Reset" did not reset all histograms [18] [19] - Fixed by David
      • No reset of normalization for pi0 plot at "reset" [20] - Fixed by David
      • Run number on the HDMONITOR elog plots [21] is getting stuck sometimes [22]
        • Run number is now printed on the plots
    • DAQ issues:
      • Zero counting rate for some ROCs [23] while occupancy plots are normal
      • Sergey did ~30 min of DAQ testing during on Saturday
  4. Monitoring
  5. Run Plan
    • Production, production, production...
    • Do we need an empty target run on Tuesday?
  6. Offline Analysis?
  7. Any Other Business?


Saturday, February 18

  1. Accelerator Status
    • Beam was mostly stable in the last 24 hrs [28]
      • 4 downtime incidents of more than 30 minutes (and a few <10 minutes):
        • Hall A setup (30min at 4PM)
        • Hall D Orbit Drifted (37min at 6PM) [29]
        • Optics check to clear 1S00 trips (32min at 4AM) [30]
        • 1L23 (ongoing since 6:35 AM) [31]
    • BPM calibration
      • All 6 BPMs are now in sync with each other! [32] [33]
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • ABU 16.73 hrs (5.80 + 5.32 + 5.61), BANU 1.73 hrs (0.28 + 0.72 + 0.73)
      • Total triggers collected: 1813 M
    • Better settings for JTV 7 Nitrogen supply valve
    • Oscillating target pressure? [34]
    • Progress on fixing random 32ns shift of TDC times [35]
    • Software issues:
      • Trouble starting Event Viewer [36]
      • CSS was unavailable for about 1 hour (network problem?) [37] [38]
      • RootSpy twice went down in an unusual mode:
        • first, for 40 minutes at 11 AM [39]
        • and from about 1 AM to 6 AM due to stalled gluon118
        • plus a few restarts in accordance with standard prescriptions
        • In 3 runs in a row, reconstruction efficiency was 20%, 30%, 50% of the template [40]
      • 3 latest shift summary reports mention DAQ reboots only 2 times! Unbelievable!!!
  3. Monitoring
  4. Run Plan
    • Production, production, production...
    • Harp scan
    • Sascha's trigger studies?
  5. Offline Analysis?
  6. Any Other Business?


Friday, February 17

  1. Accelerator Status
    • Hall was in controlled access from 7:00 till 16:30 for RF separator studies
      • Work on TRD GEM by Kondo during this time
      • Alexandre has retrieved supplemental dosimetry from the tagger
      • Production restarted at 17:30
    • Stable beam since then (max 10 minutes off on 2 occasions) [41]
    • Radiation levels are about the same as earlier [42]
    • Harp scans: MCC and ours.
      • In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
        • (0.83, 0.32), (0.63, 0.24), (0.68, ??? - the fit has failed)
        • Beam is ~20% tighter in X and twice narrower in Y comparing with a day ago
        • Photon transmission is about the same as a day ago
    • BPM calibration?
      • AD00 BPM is no longer the same as AD00C BCM but only 40% of it [43]
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • ABU 10.32 hrs (0 + 4.54 + 5.78), BANU 2.13 hrs (0 + 1.17 + 0.96)
      • Total triggers collected: 1046 M
    • The usual DAQ and RootSpy issues make shifts entertaining
  3. Monitoring
  4. Run Plan
    • Production, production, production...
    • Sascha's trigger studies?
  5. Offline Analysis?
  6. Any Other Business?


Thursday, February 16

  1. Accelerator Status
    • Stable accelerator running over the last 24 hours
    • Harp scans:
      • MCC scans before and after Todd's script
        "Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."
      • Our scan: before and after Todd's script
      • In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
        • Before: (1.31, 0.63), (1.08, 0.73), (1.03, 0.41)
        • After  : (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
    • Convergence studies from Hovanes: Feb 15 vs Feb 9
      • Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
        "... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."
    • Work on RF separation will start at 7:30 AM today and last for 2-3 hours
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • ABU 17.66 hrs (4.97 + 6.37 + 6.32), BANU 2.21 hrs (1.27 + 0.40 + 0.54)
      • Total triggers collected: 1856 M
    • A usual assortment of DAQ crashes
    • RootSpy tips:
    • New BCAL gain constants in ccdb [46]
  3. Monitoring
    • A new instance of 32ns ADC-TDC offset: [47]
  4. Run Plan
    • 7:00 AM - 7:30 AM ==> Hall safety walk-through (After RADCON does it job)
    • 7:30 AM - about 10 AM ==> MCC works on RF separation
    • A new harp scan after RF separation work is done
    • Production data
  5. Offline Analysis?
  6. Any Other Business?