Difference between revisions of "Run Planning Meeting Notes, Feb 16-Feb 22, 2017"

From GlueXWiki
Jump to: navigation, search
m
m
Line 8: Line 8:
 
==Thursday, February  16==
 
==Thursday, February  16==
 
# Accelerator Status
 
# Accelerator Status
 +
#* Stable accelerator running over the last 24 hours
 +
#* Harp scans:
 +
#** MCC scans [before https://logbooks.jlab.org/entry/3458630] and [after https://logbooks.jlab.org/entry/3458638] Todd's script
 +
#***"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."
 +
#** Our scan: [before https://logbooks.jlab.org/entry/3458624] and [after https://logbooks.jlab.org/entry/3458635] Todd's script
 +
#** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
 +
#*** Before:  (1.31, 0.63), (1.08, 0.73), (1.03, 0.41)
 +
#*** After  :  (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
 +
#* Convergence studies from Hovanes: [Feb 15 https://logbooks.jlab.org/entry/3458654] vs [Feb 9 https://logbooks.jlab.org/entry/3458258]
 +
#** Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
 +
#*** "... uncertainties ...  a lot larger compared to Feb 9.  It is hard to make any conclusions about the improvement of the spot."
 +
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 +
#*
 +
#* RootSpy tips:
 +
#** Restarting cMsg server: [https://logbooks.jlab.org/entry/3458608]
 
# Monitoring
 
# Monitoring
 
# Run Plan
 
# Run Plan
 
#* Production data
 
#* Production data
 +
#* Hall safety walk-through is supposed to happen between 7:00 AM and 7:30 AM
 
# Offline Analysis?
 
# Offline Analysis?
 
# Any Other Business?
 
# Any Other Business?
#* Hall safety walk-through will be scheduled after MCC tells us when they need our Hall to be closed for their work on RF separation.
 

Revision as of 07:17, 16 February 2017

<- Back to Run Coordination Meetings: Spring 2017 Run


Thursday, February 16

  1. Accelerator Status
  1. Hall-D/GlueX items
    • RootSpy tips:
      • Restarting cMsg server: [1]
  2. Monitoring
  3. Run Plan
    • Production data
    • Hall safety walk-through is supposed to happen between 7:00 AM and 7:30 AM
  4. Offline Analysis?
  5. Any Other Business?