Difference between revisions of "Run Planning Meeting Notes, Feb 16-Feb 22, 2017"

From GlueXWiki
Jump to: navigation, search
m
m
Line 10: Line 10:
 
#* Stable accelerator running over the last 24 hours
 
#* Stable accelerator running over the last 24 hours
 
#* Harp scans:
 
#* Harp scans:
#** MCC scans [https://logbooks.jlab.org/entry/3458630 before] and [https://logbooks.jlab.org/entry/3458638 after] Todd's script <br \>
+
#** MCC scans [https://logbooks.jlab.org/entry/3458630 before] and [https://logbooks.jlab.org/entry/3458638 after] Todd's script <br \>''"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."''
::::''"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."''
+
 
#** Our scan: [https://logbooks.jlab.org/entry/3458624 before] and [https://logbooks.jlab.org/entry/3458635 after] Todd's script
 
#** Our scan: [https://logbooks.jlab.org/entry/3458624 before] and [https://logbooks.jlab.org/entry/3458635 after] Todd's script
 
#** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
 
#** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
Line 17: Line 16:
 
#*** After  :  (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
 
#*** After  :  (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
 
#* Convergence studies from Hovanes: [https://logbooks.jlab.org/entry/3458654 Feb 15] vs [https://logbooks.jlab.org/entry/3458258 Feb 9]
 
#* Convergence studies from Hovanes: [https://logbooks.jlab.org/entry/3458654 Feb 15] vs [https://logbooks.jlab.org/entry/3458258 Feb 9]
#** Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
+
#** Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9) <br \>''"... uncertainties ...  a lot larger compared to Feb 9.  It is hard to make any conclusions about the improvement of the spot."''
::::''"... uncertainties ...  a lot larger compared to Feb 9.  It is hard to make any conclusions about the improvement of the spot."''
+
 
   
 
   
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
Line 25: Line 23:
 
#* RootSpy tips:
 
#* RootSpy tips:
 
#** [https://logbooks.jlab.org/entry/3458608 Restarting cMsg server]
 
#** [https://logbooks.jlab.org/entry/3458608 Restarting cMsg server]
#** [https://logbooks.jlab.org/entry/3458714 Multiple instances of RootSpy on gluon47]
+
#** [https://logbooks.jlab.org/entry/3458714 Multiple instances of RootSpy on gluon47] <br \>''"... no more than 1 or 2 instances running in the counting house at any point in time."''
::::''"... no more than 1 or 2 instances running in the counting house at any point in time."''
+
 
# Monitoring
 
# Monitoring
 
# Run Plan
 
# Run Plan

Revision as of 07:32, 16 February 2017

<- Back to Run Coordination Meetings: Spring 2017 Run


Thursday, February 16

  1. Accelerator Status
    • Stable accelerator running over the last 24 hours
    • Harp scans:
      • MCC scans before and after Todd's script
        "Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."
      • Our scan: before and after Todd's script
      • In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
        • Before: (1.31, 0.63), (1.08, 0.73), (1.03, 0.41)
        • After  : (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
    • Convergence studies from Hovanes: Feb 15 vs Feb 9
      • Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
        "... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."
  1. Hall-D/GlueX items
  2. Monitoring
  3. Run Plan
    • Production data
    • Hall safety walk-through is supposed to happen between 7:00 AM and 7:30 AM
  4. Offline Analysis?
  5. Any Other Business?