==Friday, February  17==
 +
# Accelerator Status
 +
#* Hall was in controlled access from 7:00 till 16:30 for RF separator studies
 +
#** Work on TRD GEM by Kondo during this time
 +
#** Alexandre has retrieved supplemental dosimetry from the tagger
 +
#** Production restarted from 17:30
 +
#* Stable beam since then (max 10 minutes off)
 +
#* Radiation levels are about the same as earlier [https://logbooks.jlab.org/entry/3458938]
 +
#* Harp scans: [https://logbooks.jlab.org/entry/3458936 MCC] and [https://logbooks.jlab.org/entry/3459009 ours].
 +
#** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
 +
#*** (0.83, 0.32), (0.63, 0.24), (0.68, ??? - the fit has failed)
 +
#*** Beam is ~20% tighter in X and '''twice narrower''' in Y comparing with a day ago
 +
#*** Photon transmission is about the same as a day ago
 +
#* BPM calibration?
 +
#** AD00 BPM is no longer the same as AD00C BCM but only 40% of it [https://logbooks.jlab.org/files/2017/02/3458969/css_2_16_swing3.png]
 +
# Hall-D/GlueX items
 +
#* In the last 24 hours:
 +
#** ABU  hrs ( +  + ), BANU 2.21 hrs ( +  + )
 +
#** Total triggers collected:  M
 +
#* The usual DAQ and RootSpy issues make shifts entertaining
 +
# Monitoring
 +
#* 32ns TDC-ADC offsets:
 +
#** rocid39 slot 13 for run 30614 [https://logbooks.jlab.org/entry/3459026]
 +
#** rocid33 slot 4 for run 30620 [https://logbooks.jlab.org/entry/3459066]
 +
#* [https://logbooks.jlab.org/entry/3458799 Low Level Monitoring Report] Feb 16
 +
# Run Plan
 +
#* Production, production, production...
 +
#* Sascha's trigger studies?
 +
# Offline Analysis?
 +
# Any Other Business?
 +
  
  

Revision as of 08:00, 17 February 2017

<- Back to Run Coordination Meetings: Spring 2017 Run


Friday, February 17

  1. Accelerator Status
    • Hall was in controlled access from 7:00 till 16:30 for RF separator studies
      • Work on TRD GEM by Kondo during this time
      • Alexandre has retrieved supplemental dosimetry from the tagger
      • Production restarted from 17:30
    • Stable beam since then (max 10 minutes off)
    • Radiation levels are about the same as earlier [1]
    • Harp scans: MCC and ours.
      • In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
        • (0.83, 0.32), (0.63, 0.24), (0.68, ??? - the fit has failed)
        • Beam is ~20% tighter in X and twice narrower in Y comparing with a day ago
        • Photon transmission is about the same as a day ago
    • BPM calibration?
      • AD00 BPM is no longer the same as AD00C BCM but only 40% of it [2]
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • ABU hrs ( + + ), BANU 2.21 hrs ( + + )
      • Total triggers collected: M
    • The usual DAQ and RootSpy issues make shifts entertaining
  3. Monitoring
  4. Run Plan
    • Production, production, production...
    • Sascha's trigger studies?
  5. Offline Analysis?
  6. Any Other Business?


Thursday, February 16

  1. Accelerator Status
    • Stable accelerator running over the last 24 hours
    • Harp scans:
      • MCC scans before and after Todd's script
        "Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."
      • Our scan: before and after Todd's script
      • In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
        • Before: (1.31, 0.63), (1.08, 0.73), (1.03, 0.41)
        • After  : (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
    • Convergence studies from Hovanes: Feb 15 vs Feb 9
      • Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
        "... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."
    • Work on RF separation will start at 7:30 AM today and last for 2-3 hours
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • ABU 17.66 hrs (4.97 + 6.37 + 6.32), BANU 2.21 hrs (1.27 + 0.40 + 0.54)
      • Total triggers collected: 1856 M
    • A usual assortment of DAQ crashes
    • RootSpy tips:
    • New BCAL gain constants in ccdb [5]
  3. Monitoring
    • A new instance of 32ns ADC-TDC offset: [6]
  4. Run Plan
    • 7:00 AM - 7:30 AM ==> Hall safety walk-through (After RADCON does it job)
    • 7:30 AM - about 10 AM ==> MCC works on RF separation
    • A new harp scan after RF separation work is done
    • Production data
  5. Offline Analysis?
  6. Any Other Business?