(Created page with "__TOC__ * == Thursday, Feb. 14 at 08:45 == # Past 24 hours: #* Acceptable quality beam established early morning around 11:00 am. #** Beam profile and convergence by Jay:ht...")
 
 
(27 intermediate revisions by one other user not shown)
Line 1: Line 1:
 
__TOC__
 
__TOC__
  
*  
+
* [[Run_Coordination_Meetings:Spring2019_Run]]
 +
* [https://halldweb.jlab.org/wiki/index.php/Spring_2019_Primex PrimEx-η run plan]
 +
* [https://halldweb.jlab.org/wiki/index.php/File:FSpring19_week3.jpg Run chart: week 3]
  
== Thursday, Feb. 14 at 08:45 ==
+
== Thursday, Feb. 21 at 08:45 ==
 
# Past 24 hours:
 
# Past 24 hours:
#* Acceptable quality beam established early morning around 11:00 am.
+
#* CPP test successful!
#** Beam profile and convergence by Jay:https://logbooks.jlab.org/entry/3652506
+
#** [https://logbooks.jlab.org/entry/3656703 Swing shift]
#* DIRC data taking.
+
#** [https://logbooks.jlab.org/entry/3656913 Owl shift]
#*# DIRC analysis is on-going.
+
 
# Issues
 
# Issues
#* Cryo Water Temperature jump to 72F (limit 70F).
+
#* TOF RF Problem solved! (Beni) [https://logbooks.jlab.org/entry/3656582] [https://logbooks.jlab.org/entry/3656585]
#** Due to pump switch: https://logbooks.jlab.org/entry/3652512
+
#* [https://logbooks.jlab.org/entry/3656759 FCAL LED pulser stuck]
#* IOC lost communication
+
#* Beam current stability [https://logbooks.jlab.org/entry/3656797] [https://logbooks.jlab.org/entry/3656827]
#** IOCHDCOL failed at 21:30. Reported to us by MCC at 0:00. Reset at 1:50 am. Hovanes verified things are ok at 3am.  https://logbooks.jlab.org/entry/3652920
+
#* DIRC SSP problem:
+
#** DAQ stopped twice due to the out of sync issue.
+
#* Tagger RF time: https://logbooks.jlab.org/entry/3652533
+
#* hdview2 is work working
+
 
#Today:
 
#Today:
#* No planned access
+
#* Hall in controlled/restricted access until 5 PM
#* Opportunistic access requested by Kenoe to work on GEM.
+
#* CCAL calibration run
#* DIRC nominal running (MOROC threshold scan?)
+
#** Beam conditions?
 +
 
 +
== Friday, Feb. 22 at 08:45 ==
 +
# Past 24 hours:
 +
#* [https://logbooks.jlab.org/entry/3657152 PrimEx configuration change]
 +
#* CCAL snake scan
 +
#** [https://logbooks.jlab.org/entry/3657311 Configuration]
 +
#** [https://logbooks.jlab.org/entry/3657318 Environment]
 +
#** Data taking started at 1 AM
 +
#** 17/140 channels scanned
 +
# Issues
 +
#* [https://logbooks.jlab.org/entry/3657504 ROCTRIG2 problematic] [https://logbooks.jlab.org/entry/3657323 Owl shift summary]
 +
# Today:
 +
#* Data taking plan
 +
#* Bleedthrough studies?
 +
#* Meeting tomorrow?
 +
 
 +
== Monday, Feb. 25 at 08:45 ==
 +
# Past 24 hours:
 +
#* Friday:
 +
#** [https://logbooks.jlab.org/entry/3657540 Monitoring updated for Primex]
 +
#** CCAL snake scan
 +
#** Nonlinearity studies
 +
#* Saturday:
 +
#** Snake scan redux
 +
#** CCAL-as-TAC runs
 +
#** Other studies?
 +
#* Sunday
 +
#** More calibrations - [https://logbooks.jlab.org/entry/3659002 gain results]
 +
#** Empty target run
 +
# Issues
 +
#* [https://logbooks.jlab.org/entry/3657890 Friday DAQ problems]
 +
#* DAQ crashes [https://logbooks.jlab.org/entry/3658041] [https://logbooks.jlab.org/entry/3658110]
 +
#* [https://logbooks.jlab.org/entry/3657867 Translation table updates]
 +
#* [https://logbooks.jlab.org/entry/3658895 DIRC alarm]
 +
#* [https://logbooks.jlab.org/entry/3659172 Low energy background]
 +
#* [https://www.jlab.org/Hall-D/shifts/ shifts need to be filled later this week]
 +
# Today:
 +
#* Be target installation 6 AM - 6 PM
 +
#* Compton data on Be
 +
 
 +
== Tuesday, Feb. 26 at 08:45 ==
 +
# Run plan discussion
 +
# Past 24 hours:
 +
#* Be target installation [https://logbooks.jlab.org/entry/3659417] [https://logbooks.jlab.org/entry/3659507]
 +
#* [https://logbooks.jlab.org/entry/3659711 Trigger setup]
 +
#* [https://logbooks.jlab.org/entry/3659759 Compton Production]:  ~500M triggers
 +
#** First production run: 61321
 +
# Issues
 +
#* [https://logbooks.jlab.org/entry/3659416 DIRC humidity alarm limits changed]
 +
# Today:
 +
#* Beam studies: 8 AM - noon?
 +
#* Compton data on Be
 +
 
 +
== Wednesday, Feb. 27 at 08:45 ==
 +
# Past 24 hours:
 +
#* Rate studies
 +
#* Compton Production:  ~900M triggers
 +
#** [https://logbooks.jlab.org/entry/3660500 Monitoring results]
 +
#* [https://logbooks.jlab.org/entry/3660207 Non-linearity studies]
 +
# Issues
 +
#* Unstable beam on swing shift
 +
#* [https://logbooks.jlab.org/entry/3660067 FCAL base changes]
 +
#* [https://logbooks.jlab.org/entry/3660461 Alarms - communication problem?]
 +
#* PS current 840A or 850A?
 +
# Today:
 +
#* Compton data on Be
 +
#* Remove target tomorrow at 8 AM

Latest revision as of 07:19, 21 March 2019

Thursday, Feb. 21 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Hall in controlled/restricted access until 5 PM
    • CCAL calibration run
      • Beam conditions?

Friday, Feb. 22 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Data taking plan
    • Bleedthrough studies?
    • Meeting tomorrow?

Monday, Feb. 25 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Be target installation 6 AM - 6 PM
    • Compton data on Be

Tuesday, Feb. 26 at 08:45

  1. Run plan discussion
  2. Past 24 hours:
  3. Issues
  4. Today:
    • Beam studies: 8 AM - noon?
    • Compton data on Be

Wednesday, Feb. 27 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Compton data on Be
    • Remove target tomorrow at 8 AM