Difference between revisions of "Run Planning Meeting Notes, Feb 21 - Feb 27, 2019"

From GlueXWiki
Jump to: navigation, search
 
(24 intermediate revisions by one other user not shown)
Line 5: Line 5:
 
* [https://halldweb.jlab.org/wiki/index.php/File:FSpring19_week3.jpg Run chart: week 3]
 
* [https://halldweb.jlab.org/wiki/index.php/File:FSpring19_week3.jpg Run chart: week 3]
  
== Thursday, Feb. 14 at 08:45 ==
+
== Thursday, Feb. 21 at 08:45 ==
 
# Past 24 hours:
 
# Past 24 hours:
 
#* CPP test successful!
 
#* CPP test successful!
 +
#** [https://logbooks.jlab.org/entry/3656703 Swing shift]
 +
#** [https://logbooks.jlab.org/entry/3656913 Owl shift]
 
# Issues
 
# Issues
#* beam current stability
+
#* TOF RF Problem solved! (Beni) [https://logbooks.jlab.org/entry/3656582] [https://logbooks.jlab.org/entry/3656585]
 +
#* [https://logbooks.jlab.org/entry/3656759 FCAL LED pulser stuck]
 +
#* Beam current stability [https://logbooks.jlab.org/entry/3656797] [https://logbooks.jlab.org/entry/3656827]
 
#Today:
 
#Today:
 
#* Hall in controlled/restricted access until 5 PM
 
#* Hall in controlled/restricted access until 5 PM
 
#* CCAL calibration run
 
#* CCAL calibration run
 +
#** Beam conditions?
 +
 +
== Friday, Feb. 22 at 08:45 ==
 +
# Past 24 hours:
 +
#* [https://logbooks.jlab.org/entry/3657152 PrimEx configuration change]
 +
#* CCAL snake scan
 +
#** [https://logbooks.jlab.org/entry/3657311 Configuration]
 +
#** [https://logbooks.jlab.org/entry/3657318 Environment]
 +
#** Data taking started at 1 AM
 +
#** 17/140 channels scanned
 +
# Issues
 +
#* [https://logbooks.jlab.org/entry/3657504 ROCTRIG2 problematic] [https://logbooks.jlab.org/entry/3657323 Owl shift summary]
 +
# Today:
 +
#* Data taking plan
 +
#* Bleedthrough studies?
 +
#* Meeting tomorrow?
 +
 +
== Monday, Feb. 25 at 08:45 ==
 +
# Past 24 hours:
 +
#* Friday:
 +
#** [https://logbooks.jlab.org/entry/3657540 Monitoring updated for Primex]
 +
#** CCAL snake scan
 +
#** Nonlinearity studies
 +
#* Saturday:
 +
#** Snake scan redux
 +
#** CCAL-as-TAC runs
 +
#** Other studies?
 +
#* Sunday
 +
#** More calibrations - [https://logbooks.jlab.org/entry/3659002 gain results]
 +
#** Empty target run
 +
# Issues
 +
#* [https://logbooks.jlab.org/entry/3657890 Friday DAQ problems]
 +
#* DAQ crashes [https://logbooks.jlab.org/entry/3658041] [https://logbooks.jlab.org/entry/3658110]
 +
#* [https://logbooks.jlab.org/entry/3657867 Translation table updates]
 +
#* [https://logbooks.jlab.org/entry/3658895 DIRC alarm]
 +
#* [https://logbooks.jlab.org/entry/3659172 Low energy background]
 +
#* [https://www.jlab.org/Hall-D/shifts/ shifts need to be filled later this week]
 +
# Today:
 +
#* Be target installation 6 AM - 6 PM
 +
#* Compton data on Be
 +
 +
== Tuesday, Feb. 26 at 08:45 ==
 +
# Run plan discussion
 +
# Past 24 hours:
 +
#* Be target installation [https://logbooks.jlab.org/entry/3659417] [https://logbooks.jlab.org/entry/3659507]
 +
#* [https://logbooks.jlab.org/entry/3659711 Trigger setup]
 +
#* [https://logbooks.jlab.org/entry/3659759 Compton Production]:  ~500M triggers
 +
#** First production run: 61321
 +
# Issues
 +
#* [https://logbooks.jlab.org/entry/3659416 DIRC humidity alarm limits changed]
 +
# Today:
 +
#* Beam studies: 8 AM - noon?
 +
#* Compton data on Be
 +
 +
== Wednesday, Feb. 27 at 08:45 ==
 +
# Past 24 hours:
 +
#* Rate studies
 +
#* Compton Production:  ~900M triggers
 +
#** [https://logbooks.jlab.org/entry/3660500 Monitoring results]
 +
#* [https://logbooks.jlab.org/entry/3660207 Non-linearity studies]
 +
# Issues
 +
#* Unstable beam on swing shift
 +
#* [https://logbooks.jlab.org/entry/3660067 FCAL base changes]
 +
#* [https://logbooks.jlab.org/entry/3660461 Alarms - communication problem?]
 +
#* PS current 840A or 850A?
 +
# Today:
 +
#* Compton data on Be
 +
#* Remove target tomorrow at 8 AM

Latest revision as of 07:19, 21 March 2019

Thursday, Feb. 21 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Hall in controlled/restricted access until 5 PM
    • CCAL calibration run
      • Beam conditions?

Friday, Feb. 22 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Data taking plan
    • Bleedthrough studies?
    • Meeting tomorrow?

Monday, Feb. 25 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Be target installation 6 AM - 6 PM
    • Compton data on Be

Tuesday, Feb. 26 at 08:45

  1. Run plan discussion
  2. Past 24 hours:
  3. Issues
  4. Today:
    • Beam studies: 8 AM - noon?
    • Compton data on Be

Wednesday, Feb. 27 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Compton data on Be
    • Remove target tomorrow at 8 AM