(Monday, Feb. 25 at 08:45)
(Monday, Feb. 25 at 08:45)
Line 53: Line 53:
 
#* [https://logbooks.jlab.org/entry/3658895 DIRC alarm]
 
#* [https://logbooks.jlab.org/entry/3658895 DIRC alarm]
 
#* [https://logbooks.jlab.org/entry/3659172 Low energy background]
 
#* [https://logbooks.jlab.org/entry/3659172 Low energy background]
 +
#* [https://www.jlab.org/Hall-D/shifts/ shifts need to be filled later this week]
 
# Today:
 
# Today:
 
#* Be target installation 6 AM - 6 PM
 
#* Be target installation 6 AM - 6 PM
 
#* Compton data on Be
 
#* Compton data on Be

Revision as of 01:43, 25 February 2019

Thursday, Feb. 21 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Hall in controlled/restricted access until 5 PM
    • CCAL calibration run
      • Beam conditions?

Friday, Feb. 22 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • Data taking plan
    • Bleedthrough studies?
    • Meeting tomorrow?

Monday, Feb. 25 at 08:45

  1. Past 24 hours:
    • Friday:
    • Saturday:
      • Snake scan reduxs
      • CCAL-as-TAC runs
      • Other studies?
    • Sunday
      • More calibrations
      • Empty target run
  2. Issues
  3. Today:
    • Be target installation 6 AM - 6 PM
    • Compton data on Be