Difference between revisions of "Run Planning Meeting Notes, Feb 22-Feb 28, 2018"

From GlueXWiki
Jump to: navigation, search
(Wednesday, February 28)
(Wednesday, February 28)
Line 155: Line 155:
 
# Longer Term Planning:
 
# Longer Term Planning:
 
#* [https://cebaf.jlab.org/files/ops/accboard/ Accelerator plans] for next week
 
#* [https://cebaf.jlab.org/files/ops/accboard/ Accelerator plans] for next week
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week8.jpg Updated Plan for next week]
 
#* [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=0 Low-intensity scan proposal]
 
#* [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=0 Low-intensity scan proposal]
 
#* FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
 
#* FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.

Revision as of 09:44, 28 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 22

  1. Notes from the previous 24 hours:
    • Continued production data until 1:30pm
    • Secretary Perry toured Hall D
    • Beam delivery shaky: Swing shift summary
    • DAQ/cMesg/rootSPY issues
    • Dipole trip
    • Transmission looks ok
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan once beam returns
    • Production data

Friday, February 23

  1. Notes from the previous 24 hours:
    • Production data
    • Beam taken away 11:15-14:14 for linac issues
    • Owl Shift Summary: rho, omega, phi triggers
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data

Saturday, February 24

  • No Hall D Counting Room meeting due to Collaboration Meeting

Sunday, February 25

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • Move collimator+beam
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • CDC 160 ns shift: bring window even closer, narrow its width? Revert to CDC integral mode.
    • MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning: does not look good
    • Production data
    • Harp (around noon)
    • Special CDC run on diamond at 100nA for 30 min (Naomi will analyze)
    • Put profiler in to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes)
    • Move collimator (Hovanes)
    • PS scalers check (Sasha)
    • Change CDC to integral mode and keep for rest of run (Sasha)

Monday, February 26

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • TAC plans
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning: yesterday's scan
    • Production data (until 1pm)
    • During Optics studies (1-3pm)
      • Elton walk through in Hall D and Tagger Hall.
      • MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
      • FCAL bases
    • Production data

Tuesday, February 27

  1. Notes from the previous 24 hours:
  2. Issues:
    • Magnet dump
    • Trouble starting DAQ: rocps1 and rocps2 configuration files
  3. Reports:
  4. Longer Term Planning:
    • FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • TAC plans
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • During magnet ramp up: AC, diamond alignment,...
    • Controlled Access during Tuesday's RF recovery?
    • Harp scan after beam comes back?
    • Production data

Wednesday, February 28

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Longer Term Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Production data