Difference between revisions of "Run Planning Meeting Notes, Feb 28 - Mar 6, 2019"

From GlueXWiki
Jump to: navigation, search
Line 27: Line 27:
 
== Friday, Mar. 1 at 08:45 ==
 
== Friday, Mar. 1 at 08:45 ==
 
# Past 24 hours:
 
# Past 24 hours:
 +
#* [https://logbooks.jlab.org/entry/3661211 Be target removed]
 
#* [https://logbooks.jlab.org/entry/3661206 Examination of material in beamline]
 
#* [https://logbooks.jlab.org/entry/3661206 Examination of material in beamline]
 
#* [https://logbooks.jlab.org/comment/20469#comment-20469 Shift in CompCal acceptance along +x]
 
#* [https://logbooks.jlab.org/comment/20469#comment-20469 Shift in CompCal acceptance along +x]
#* Empty target production: ??? billion triggers with empty target (Runs 61345-???)
+
#** FCAL survey from 2015 shows it is shifted in +x direction by 0.5 cm, which matches the shift in CompCal acceptance
 +
# Compton production statistics
 +
#** 0.24 billion triggers with no target ([https://halldweb.jlab.org/rcdb/runs/search?runFrom=61308&runTo=61311&q=beam_current+%3E+25+and+event_count%3E5e5 Runs 61308-61311])
 +
#** 2.86 billion triggers with Be ([https://halldweb.jlab.org/rcdb/runs/search?runFrom=61321&runTo=61344&q=beam_current+%3E+25+and+event_count%3E5e5 Runs 61321-61344])
 +
#*  0.42 billion triggers with empty target holder cylinder ([https://halldweb.jlab.org/rcdb/runs/search?runFrom=61345&runTo=61354&q=beam_current+%3E+25+and+event_count%3E5e5 Runs 61345-61354])
 +
#* Summary: Empty target is ~25% of statistics for Be target running
 
# Today's plan:
 
# Today's plan:
 
#* LHe target installation:  
 
#* LHe target installation:  
#** Hall open at 6 am for bleeding up beamline
+
#** Hall opened at 6 am for bleeding up beamline and target removal
 +
#** Target installation and survey throughout the day
 
#** Other work in the Hall: start counter installation, others?
 
#** Other work in the Hall: start counter installation, others?
 
# LHe target cooldown and filling schedule?
 
# LHe target cooldown and filling schedule?
 
#* Chris expects ~10-12 hours required for cooldown.  He would like to be here during the initial fill.
 
#* Chris expects ~10-12 hours required for cooldown.  He would like to be here during the initial fill.
 
#* Possible plan: Run warm empty target for few shifts, start cooldown over the weekend and fill on Sunday/Monday?
 
#* Possible plan: Run warm empty target for few shifts, start cooldown over the weekend and fill on Sunday/Monday?

Revision as of 08:38, 1 March 2019



Thursday, Feb. 28 at 08:45

  1. Past 24 hours:
  2. Today (Thursday):
    • Remove Be foil @ 8 AM, but leave cylindrical holding tube. Lockup hall at ~1 pm
    • Production running with no target until 6 am Friday morning
  3. Friday plan:
    • LHe target installation:
      • Hall open at 6 am for bleeding up beamline

Friday, Mar. 1 at 08:45

  1. Past 24 hours:
  2. Compton production statistics
    • 0.42 billion triggers with empty target holder cylinder (Runs 61345-61354)
    • Summary: Empty target is ~25% of statistics for Be target running
  3. Today's plan:
    • LHe target installation:
      • Hall opened at 6 am for bleeding up beamline and target removal
      • Target installation and survey throughout the day
      • Other work in the Hall: start counter installation, others?
  4. LHe target cooldown and filling schedule?
    • Chris expects ~10-12 hours required for cooldown. He would like to be here during the initial fill.
    • Possible plan: Run warm empty target for few shifts, start cooldown over the weekend and fill on Sunday/Monday?