Difference between revisions of "Run Planning Meeting Notes, Feb 6 - Feb 13, 2019"

From GlueXWiki
Jump to: navigation, search
(Monday, Feb. 11 at 08:45)
(Monday, Feb. 11 at 08:45)
Line 6: Line 6:
 
#**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops]
 
#**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops]
 
#**TOF RF status?  
 
#**TOF RF status?  
# DIRC Commissioning with beam:
+
# DIRC Commissioning with beam over weekend:
 
#* [https://logbooks.jlab.org/entry/3649673 First online monitoring plots]
 
#* [https://logbooks.jlab.org/entry/3649673 First online monitoring plots]
 
#* [https://logbooks.jlab.org/entry/3650290 First comparison of time/angle correlations of hits (with data/MC comparison)]
 
#* [https://logbooks.jlab.org/entry/3650290 First comparison of time/angle correlations of hits (with data/MC comparison)]

Revision as of 09:43, 11 February 2019

Monday, Feb. 11 at 08:45

  1. Notes from the past 72 hours:
  2. DIRC Commissioning with beam over weekend:
  3. Today's plan (changed this morning at the 8:00am MCC meeting)
    • 8am-9:30am: High beam current push for Hall C. At best, low quality beam, very trippy. We maintain the planned access for Hall D
    • 9:30am-??12:30am-2:30am?? RF recovery: No beam
    • After RF recovery: spin dance for Hall B.
      • Minimally invasive: 2 or 3 instances of 20 min beam off for spin angle rotation at the source. Beam available in between.
      • Restart DIRC commissioning.
    • MCC white board
    • This week time chart
    • Hall D white board