Difference between revisions of "Run Planning Meeting Notes, Feb 6 - Feb 13, 2019"

From GlueXWiki
Jump to: navigation, search
m (Tuesday, Feb. 12 at 08:45)
Line 5: Line 5:
 
#**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops]
 
#**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops]
 
#**TOF RF status?  
 
#**TOF RF status?  
#**[ Beam current can drift by 10+ MeV]. Do we care?
+
#**[https://halldweb.jlab.org/wiki/index.php/File:Energy_drift.jpg Beam current can drift by 10+ MeV]. Do we care?
  
 
== Monday, Feb. 11 at 08:45 ==
 
== Monday, Feb. 11 at 08:45 ==

Revision as of 08:32, 12 February 2019

Tuesday, Feb. 12 at 08:45

  1. Notes from the past 24 hours:
    • Beam off from 8am-3:24pm due to high beam current push for Hall C and then RF recovery. After than some bean during swing shift and good beam during owl.
    • Issues

Monday, Feb. 11 at 08:45

  1. Notes from the past 72 hours:
  2. DIRC Commissioning with beam over weekend:
  3. Today's plan (changed this morning at the 8:00am MCC meeting)
    • 8am-9:30am: High beam current push for Hall C. At best, low quality beam, very trippy. We maintain the planned access for Hall D
    • 9:30am-??12:30pm-2:30pm?? RF recovery: No beam
    • After RF recovery: spin dance for Hall B.
      • Minimally invasive: 2 or 3 instances of 20 min beam off for spin angle rotation at the source. Beam available in between.
      • Restart DIRC commissioning.
    • MCC white board
    • This week time chart
    • Hall D white board