Difference between revisions of "Run Planning Meeting Notes, Feb 6 - Feb 13, 2019"
From GlueXWiki
m (→Tuesday, Feb. 12 at 08:45) |
|||
Line 2: | Line 2: | ||
# Notes from the past 24 hours: | # Notes from the past 24 hours: | ||
#* Beam off from 8am-3:24pm due to high beam current push for Hall C and then RF recovery. After than some bean during swing shift and good beam during owl. | #* Beam off from 8am-3:24pm due to high beam current push for Hall C and then RF recovery. After than some bean during swing shift and good beam during owl. | ||
− | #* | + | #* PS thr. scan finalized. |
− | #**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops] | + | #* DIRC production data taking over night |
− | # | + | # Issues |
− | # | + | #*[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops] |
+ | #*TOF RF status? | ||
+ | #*[https://halldweb.jlab.org/wiki/index.php/File:Energy_drift.jpg Beam current can drift by 10+ MeV]. Do we care? | ||
+ | #Today's plan (changed this morning at the 8:00am MCC meeting) | ||
+ | #*[https://cebaf.jlab.org/files/ops/accboard/ MCC white board] | ||
+ | #*[https://halldweb.jlab.org/wiki/images/6/64/Spring19_week1.jpg This week time chart] | ||
+ | #*[https://halldweb.jlab.org/online/whiteboard/ Hall D white board] | ||
== Monday, Feb. 11 at 08:45 == | == Monday, Feb. 11 at 08:45 == |
Revision as of 08:34, 12 February 2019
Tuesday, Feb. 12 at 08:45
- Notes from the past 24 hours:
- Beam off from 8am-3:24pm due to high beam current push for Hall C and then RF recovery. After than some bean during swing shift and good beam during owl.
- PS thr. scan finalized.
- DIRC production data taking over night
- Issues
- [1], [2] DAQ lifetime sometimes drops]
- TOF RF status?
- Beam current can drift by 10+ MeV. Do we care?
- Today's plan (changed this morning at the 8:00am MCC meeting)
Monday, Feb. 11 at 08:45
- Notes from the past 72 hours:
- Beam restoration, system checkout and start of DIRC commissioning going well.
- Issues
- Harp at 5C11, Harp at 5C11b, Hall D harp+ fit, Coherent peak as of this morning Beam convergences probably bad. Do we want to address this?
- [3], [4] DAQ lifetime sometimes drops]
- TOF RF status?
- DIRC Commissioning with beam over weekend:
- Today's plan (changed this morning at the 8:00am MCC meeting)
- 8am-9:30am: High beam current push for Hall C. At best, low quality beam, very trippy. We maintain the planned access for Hall D
- 9:30am-??12:30pm-2:30pm?? RF recovery: No beam
- After RF recovery: spin dance for Hall B.
- Minimally invasive: 2 or 3 instances of 20 min beam off for spin angle rotation at the source. Beam available in between.
- Restart DIRC commissioning.
- MCC white board
- This week time chart
- Hall D white board