== Wednesday, Feb. 13 at 08:45 ==
 +
# Notes from the past 24 hours:
 +
#*Investigations of SSP problem
 +
#**40 min access for SSP issue. Sergei also looked at TOF RF problem, and Lubomir worked on TRD.
 +
#**[https://logbooks.jlab.org/entry/3652012 Some success in identifying issue and partly fixing it]
 +
#**[https://logbooks.jlab.org/entry/3652330 Only one instance of lifetime dropping to zero after the fix]
 +
#*DIRC data taking.
 +
# Issues
 +
#*Beam stirring issue. MCC cannot deliver more than 65 nA.
 +
#** Only ran on amo since last evening.
 +
#** [https://logbooks.jlab.org/entry/3652433 Beam transmission look fine]
 +
#*[https://logbooks.jlab.org/entry/3651965 Beam convergence]
 +
#*SSP problem
 +
#*[https://logbooks.jlab.org/entry/3651748], [https://logbooks.jlab.org/entry/3651772] Target control problem. [https://logbooks.jlab.org/entry/3651725 Target alarms were not enabled].
 +
#*TOF RF status?
 +
#*Beam current can drift by have been drifting by up to 15 MeV the last 24h
 +
#Today's plan (changed this morning at the 8:00am MCC meeting)
 +
#*Beam scheduled for all day: DIRC commissioning+Thr. scan (LED&dark runs done) + data taking overnight.
 +
#*[https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
 +
#*[https://halldweb.jlab.org/wiki/images/6/64/Spring19_week1.jpg This week time chart]
 +
#*[https://halldweb.jlab.org/online/whiteboard/ Hall D white board]
 +
 
== Tuesday, Feb. 12 at 08:45 ==
 
== Tuesday, Feb. 12 at 08:45 ==
 
# Notes from the past 24 hours:
 
# Notes from the past 24 hours:
 
#* Beam off from 8am-3:24pm due to high beam current push for Hall C and then RF recovery. After than some bean during swing shift and good beam during owl.
 
#* Beam off from 8am-3:24pm due to high beam current push for Hall C and then RF recovery. After than some bean during swing shift and good beam during owl.
 +
#**We did an access while beam was off:
 +
#***[https://logbooks.jlab.org/entry/3651207 Acess for DIRC]
 +
#***Beni Adjusted CDC gas flow.
 
#* PS thr. scan finalized.
 
#* PS thr. scan finalized.
 
#* DIRC production data taking over night  
 
#* DIRC production data taking over night  
 
# Issues
 
# Issues
#*[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops]
+
#* Current limited at 150 nA(diamond)/50nA(amo) due to DAQ problem below.
 +
#*[https://logbooks.jlab.org/files/2019/02/3651425/90percent_then_0.png], [https://logbooks.jlab.org/files/2019/02/3651503/Screenshot%20from%202019-02-12%2001-52-42.png] ,[https://logbooks.jlab.org/files/2019/02/3651505/Screenshot%20from%202019-02-12%2001-55-41.png] DAQ lifetime dropped to zero many times (I counted 8).
 
#*TOF RF status?  
 
#*TOF RF status?  
#*[https://halldweb.jlab.org/wiki/index.php/File:Energy_drift.jpg Beam current can drift by 10+ MeV]. Do we care?
+
#*[https://halldweb.jlab.org/wiki/index.php/File:Energy_drift.jpg Beam energy can drift by 10+ MeV]. Do we care?
 
#Today's plan (changed this morning at the 8:00am MCC meeting)
 
#Today's plan (changed this morning at the 8:00am MCC meeting)
 +
#*Beam scheduled for all day: DIRC commissioning+Thr. scan+LED&dark runs+data taking overnight.
 
#*[https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
 
#*[https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
 
#*[https://halldweb.jlab.org/wiki/images/6/64/Spring19_week1.jpg This week time chart]
 
#*[https://halldweb.jlab.org/wiki/images/6/64/Spring19_week1.jpg This week time chart]

Latest revision as of 07:17, 21 March 2019

Wednesday, Feb. 13 at 08:45

  1. Notes from the past 24 hours:
  2. Issues
  3. Today's plan (changed this morning at the 8:00am MCC meeting)

Tuesday, Feb. 12 at 08:45

  1. Notes from the past 24 hours:
    • Beam off from 8am-3:24pm due to high beam current push for Hall C and then RF recovery. After than some bean during swing shift and good beam during owl.
      • We did an access while beam was off:
    • PS thr. scan finalized.
    • DIRC production data taking over night
  2. Issues
  3. Today's plan (changed this morning at the 8:00am MCC meeting)

Monday, Feb. 11 at 08:45

  1. Notes from the past 72 hours:
  2. DIRC Commissioning with beam over weekend:
  3. Today's plan (changed this morning at the 8:00am MCC meeting)
    • 8am-9:30am: High beam current push for Hall C. At best, low quality beam, very trippy. We maintain the planned access for Hall D
    • 9:30am-??12:30pm-2:30pm?? RF recovery: No beam
    • After RF recovery: spin dance for Hall B.
      • Minimally invasive: 2 or 3 instances of 20 min beam off for spin angle rotation at the source. Beam available in between.
      • Restart DIRC commissioning.
    • MCC white board
    • This week time chart
    • Hall D white board