Difference between revisions of "Run Planning Meeting Notes, Feb 6 - Feb 13, 2019"
From GlueXWiki
(Created page with "== Monday, Feb. 11 at 08:45 == # Notes from the past 72 hours: #* Beam restoration, system checkout and start of DIRC commissioning going well. #* Issues #**[https://logbooks....") |
m (→Monday, Feb. 11 at 08:45) |
||
Line 6: | Line 6: | ||
#**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops] | #**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops] | ||
#**TOF RF status? | #**TOF RF status? | ||
− | |||
#Today's plan | #Today's plan | ||
#*8am: Hall D requested access during spin dance for Hall B. | #*8am: Hall D requested access during spin dance for Hall B. |
Revision as of 08:22, 11 February 2019
Monday, Feb. 11 at 08:45
- Notes from the past 72 hours:
- Beam restoration, system checkout and start of DIRC commissioning going well.
- Issues
- Harp at 5C11, Harp at 5C11b, Hall D harp+ fit, Coherent peak as of this morning Beam convergences probably bad. Do we want to address this?
- [1], [2] DAQ lifetime sometimes drops]
- TOF RF status?
- Today's plan
- 8am: Hall D requested access during spin dance for Hall B.
- MCC white board
- This week time chart
- Hall D white board