Monday, Feb. 11 at 08:45

  1. Notes from the past 72 hours:
  2. DIRC Commissioning with beam:
  3. Today's plan (changed this morning at the 8:00am MCC meeting)
    • 8am-9:30am: High beam current push for Hall C. At best, low quality beam, very trippy. We maintain the planned access for Hall D
    • 9:30am-??12:30am-2:30am?? RF recovery: No beam
    • After RF recovery: spin dance for Hall B.
      • Minimally invasive: 2 or 3 instances of 20 min beam off for spin angle rotation at the source. Beam available in between.
      • Restart DIRC commissioning.