== Thursday, February 8 ==
 
== Thursday, February 8 ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
#*
+
#* 30 minutes of raw mode data
 +
#* 4 hours Low intensity running with min bias trigger [https://logbooks.jlab.org/entry/3529154 trigger rate]
 +
#* [https://logbooks.jlab.org/entry/3529109 TAGM columns fixed during opportunistic access], [https://logbooks.jlab.org/entry/3529080 board swap], [https://logbooks.jlab.org/entry/3529091 parameters changed]
 +
#* [https://logbooks.jlab.org/entry/3529159 TAGH time and time with respect to the main trigger OK]
 +
#* [https://logbooks.jlab.org/entry/3528840 Harp scans show good convergence]
 +
#* [https://logbooks.jlab.org/entry/3529134 Low level monitoring]
 +
#* [https://logbooks.jlab.org/entry/3529012 surpassed 40 billion triggers]
 +
#* [
 
# Issues:
 
# Issues:
 
#*  
 
#*  
 
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]:
 
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]:
#*  
+
#* Beam will be taken to steer the injector to make A and C beams colinear
 +
#** Opportunistic access for FCAL bases and to retrieve microscope preamp
 
# Reports (?):
 
# Reports (?):
 +
#* [https://logbooks.jlab.org/entry/3529156 Initial TPOL results] are available. More work needed, ~3% statistical uncertainties, poor chi2
 +
#* [https://logbooks.jlab.org/entry/3529130 Rate evolution]
 
# Standing issues:
 
# Standing issues:
#* [https://logbooks.jlab.org/entry/3527379 Rate evolution]: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.
 
#* TPOL analysis status?
 

Revision as of 09:40, 8 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 8

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Today's run plan Google Calendar:
    • Beam will be taken to steer the injector to make A and C beams colinear
      • Opportunistic access for FCAL bases and to retrieve microscope preamp
  4. Reports (?):
  5. Standing issues: