Difference between revisions of "Run Planning Meeting Notes, Feb 8-Feb 14, 2018"

From GlueXWiki
Jump to: navigation, search
Line 10: Line 10:
 
# Issues:
 
# Issues:
 
#* [https://logbooks.jlab.org/entry/3531251 Beam is over-focused in Y] leading to [https://logbooks.jlab.org/entry/3531226 ~15 % lower transmission], [https://logbooks.jlab.org/entry/3531216 2]
 
#* [https://logbooks.jlab.org/entry/3531251 Beam is over-focused in Y] leading to [https://logbooks.jlab.org/entry/3531226 ~15 % lower transmission], [https://logbooks.jlab.org/entry/3531216 2]
#* [https://logbooks.jlab.org/entry/3531144 Position at dump is 4 mm different in X], [https://logbooks.jlab.org/entry/3531183 2]
+
#* [https://logbooks.jlab.org/entry/3531144 Position at dump is 4 mm different in X], [https://logbooks.jlab.org/entry/3531226 tagger field is 0.15% lower]
 
#* [https://logbooks.jlab.org/entry/3531116 Goni vertical stage tripped] should reboot controller
 
#* [https://logbooks.jlab.org/entry/3531116 Goni vertical stage tripped] should reboot controller
 
#* DAQ problems overnight, about 1 hour lost.
 
#* DAQ problems overnight, about 1 hour lost.

Revision as of 09:41, 13 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Tuesday, February 13

  1. Notes from the previous 24 hours:
    • No beam since Friday
  2. Issues:
  3. Today's run plan Google Calendar:
    • Production
  4. Reports (?):
  5. Standing issues:

Monday, February 12

  1. Notes from the previous 24 hours:
    • No beam since Friday
  2. Issues:
  3. Today's run plan Google Calendar:
    • Production
  4. Reports (?):
  5. Standing issues:

Friday, February 9

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Today's run plan Google Calendar:
    • PROGRAM INTERRUPTION
      • Shifts on standby (until Saturday Swing? pending further information from MCC)
  4. Reports (?):
  5. Standing issues:
    • Weekend meeting?



Thursday, February 8

  1. Notes from the previous 24 hours:
  2. Issues:
    • What goal/expectation should we express to MCC?
  3. Today's run plan Google Calendar:
    • Beam will be taken to steer the injector to make A and C beams colinear
      • Opportunistic access for FCAL bases and to retrieve microscope preamp
  4. Reports (?):
  5. Standing issues: