Difference between revisions of "Run Planning Meeting Notes, Feb 8-Feb 14, 2018"

From GlueXWiki
Jump to: navigation, search
 
(4 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Trigger Spreadsheet]
 
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Trigger Spreadsheet]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]
 +
 +
 +
== Wednesday, February 14 ❤️==
 +
# Notes from the previous 24 hours:
 +
#* Mostly production, implemented new focus solution and backed out again.
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3531251 Current focus is not optimal],[https://logbooks.jlab.org/entry/3531773 transmission low by 15%], [https://logbooks.jlab.org/entry/3531786  CBSA polarization low]
 +
#* [https://logbooks.jlab.org/entry/3531356 New solution significantly worse]
 +
#* [https://logbooks.jlab.org/entry/3531588 FDC beta vs p plot having worse resolution]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]:
 +
#* Implement new focus solution when available
 +
#* High current testing
 +
#** Beam current
 +
#* Current scan of short runs
 +
#** Goals: measure rates and occupancies, obtain a sample asynchronous triggers for use in simulation.
 +
#** Implementation: Beam currents: 50, 100, 200, 250 nA
 +
#* Thicker TPOL converter livetime test
 +
#* Test stability of V wire setup
 +
#** needs access to install lead on profiler and zero AC calibration
 +
# Reports (?):
 +
#* [https://logbooks.jlab.org/entry/3531799 cdc current scales with e-beam current]
 +
# Standing issues:
  
 
== Tuesday, February 13 ==
 
== Tuesday, February 13 ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
#* No beam since Friday
+
#* Beam returned on Owl
 
# Issues:
 
# Issues:
 
#* [https://logbooks.jlab.org/entry/3531251 Beam is over-focused in Y] leading to [https://logbooks.jlab.org/entry/3531226 ~15 % lower transmission], [https://logbooks.jlab.org/entry/3531216 2]
 
#* [https://logbooks.jlab.org/entry/3531251 Beam is over-focused in Y] leading to [https://logbooks.jlab.org/entry/3531226 ~15 % lower transmission], [https://logbooks.jlab.org/entry/3531216 2]

Latest revision as of 09:23, 14 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run


Wednesday, February 14 ❤️

  1. Notes from the previous 24 hours:
    • Mostly production, implemented new focus solution and backed out again.
  2. Issues:
  3. Today's run plan Google Calendar:
    • Implement new focus solution when available
    • High current testing
      • Beam current
    • Current scan of short runs
      • Goals: measure rates and occupancies, obtain a sample asynchronous triggers for use in simulation.
      • Implementation: Beam currents: 50, 100, 200, 250 nA
    • Thicker TPOL converter livetime test
    • Test stability of V wire setup
      • needs access to install lead on profiler and zero AC calibration
  4. Reports (?):
  5. Standing issues:

Tuesday, February 13

  1. Notes from the previous 24 hours:
    • Beam returned on Owl
  2. Issues:
  3. Today's run plan Google Calendar:
    • Production
  4. Reports (?):
  5. Standing issues:

Monday, February 12

  1. Notes from the previous 24 hours:
    • No beam since Friday
  2. Issues:
  3. Today's run plan Google Calendar:
    • Production
  4. Reports (?):
  5. Standing issues:

Friday, February 9

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Today's run plan Google Calendar:
    • PROGRAM INTERRUPTION
      • Shifts on standby (until Saturday Swing? pending further information from MCC)
  4. Reports (?):
  5. Standing issues:
    • Weekend meeting?



Thursday, February 8

  1. Notes from the previous 24 hours:
  2. Issues:
    • What goal/expectation should we express to MCC?
  3. Today's run plan Google Calendar:
    • Beam will be taken to steer the injector to make A and C beams colinear
      • Opportunistic access for FCAL bases and to retrieve microscope preamp
  4. Reports (?):
  5. Standing issues: