* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar] | ||
+ | |||
+ | |||
+ | == Wednesday, February 14 ❤️== | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* Mostly production, implemented new focus solution and backed out again. | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3531251 Current focus is not optimal],[https://logbooks.jlab.org/entry/3531773 transmission low by 15%], [https://logbooks.jlab.org/entry/3531786 CBSA polarization low] | ||
+ | #* [https://logbooks.jlab.org/entry/3531356 New solution significantly worse] | ||
+ | #* [https://logbooks.jlab.org/entry/3531588 FDC beta vs p plot having worse resolution] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | ||
+ | #* Implement new focus solution when available | ||
+ | #* High current testing | ||
+ | #** Beam current | ||
+ | #* Current scan of short runs | ||
+ | #** Goals: measure rates and occupancies, obtain a sample asynchronous triggers for use in simulation. | ||
+ | #** Implementation: Beam currents: 50, 100, 200, 250 nA | ||
+ | #* Thicker TPOL converter livetime test | ||
+ | #* Test stability of V wire setup | ||
+ | #** needs access to install lead on profiler and zero AC calibration | ||
+ | # Reports (?): | ||
+ | #* [https://logbooks.jlab.org/entry/3531799 cdc current scales with e-beam current] | ||
+ | # Standing issues: | ||
+ | |||
+ | == Tuesday, February 13 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* Beam returned on Owl | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3531251 Beam is over-focused in Y] leading to [https://logbooks.jlab.org/entry/3531226 ~15 % lower transmission], [https://logbooks.jlab.org/entry/3531216 2] | ||
+ | #* [https://logbooks.jlab.org/entry/3531144 Position at dump is 4 mm different in X], [https://logbooks.jlab.org/entry/3531226 tagger tripped Feb. 11th 22:41 and field is 0.15% lower] | ||
+ | #* [https://logbooks.jlab.org/entry/3531116 Goni vertical stage tripped] should reboot controller | ||
+ | #* DAQ problems overnight, about 1 hour lost. | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | ||
+ | #* Production | ||
+ | # Reports (?): | ||
+ | # Standing issues: | ||
+ | |||
+ | == Monday, February 12 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* No beam since Friday | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3530267 Quad MQPAD00 value] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | ||
+ | #* Production | ||
+ | # Reports (?): | ||
+ | # Standing issues: | ||
+ | |||
+ | == Friday, February 9 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* Rapid Access Approved! Collimator cave excluded. | ||
+ | #* [https://logbooks.jlab.org/entry/3529231 FCAL signal testing] Two broken lemo connectors at the base, two unplugged lemo cables, [https://logbooks.jlab.org/entry/3529351 one swapped base] | ||
+ | #* [https://logbooks.jlab.org/entry/3529202 Trigger rates available in epics] | ||
+ | #* [https://logbooks.jlab.org/entry/3529666 Harp scans show good convergence ] | ||
+ | #* [https://logbooks.jlab.org/entry/3529595 Difficulty starting DAQ ] (reboot rocPS1) | ||
+ | #* [https://logbooks.jlab.org/entry/3529632 Low level monitoring ] | ||
+ | #* [https://logbooks.jlab.org/entry/3529249 Muon chamber light leak fix] | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3529420 Spurious extra headers in data ] | ||
+ | #* [https://logbooks.jlab.org/entry/3529289 Tagger efficiency], [https://logbooks.jlab.org/entry/3529272 other runs] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | ||
+ | #* [https://logbooks.jlab.org/entry/3529377 PROGRAM INTERRUPTION] | ||
+ | #** Shifts on standby (until Saturday Swing? pending further information from MCC) | ||
+ | # Reports (?): | ||
+ | #* [https://logbooks.jlab.org/entry/3529396 Electron beam energy] | ||
+ | # Standing issues: | ||
+ | #* Weekend meeting? | ||
+ | |||
+ | |||
+ | |||
== Thursday, February 8 == | == Thursday, February 8 == |
Latest revision as of 08:23, 14 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Wednesday, February 14 ❤️
- Notes from the previous 24 hours:
- Mostly production, implemented new focus solution and backed out again.
- Issues:
- Today's run plan Google Calendar:
- Implement new focus solution when available
- High current testing
- Beam current
- Current scan of short runs
- Goals: measure rates and occupancies, obtain a sample asynchronous triggers for use in simulation.
- Implementation: Beam currents: 50, 100, 200, 250 nA
- Thicker TPOL converter livetime test
- Test stability of V wire setup
- needs access to install lead on profiler and zero AC calibration
- Reports (?):
- Standing issues:
Tuesday, February 13
- Notes from the previous 24 hours:
- Beam returned on Owl
- Issues:
- Beam is over-focused in Y leading to ~15 % lower transmission, 2
- Position at dump is 4 mm different in X, tagger tripped Feb. 11th 22:41 and field is 0.15% lower
- Goni vertical stage tripped should reboot controller
- DAQ problems overnight, about 1 hour lost.
- Today's run plan Google Calendar:
- Production
- Reports (?):
- Standing issues:
Monday, February 12
- Notes from the previous 24 hours:
- No beam since Friday
- Issues:
- Today's run plan Google Calendar:
- Production
- Reports (?):
- Standing issues:
Friday, February 9
- Notes from the previous 24 hours:
- Rapid Access Approved! Collimator cave excluded.
- FCAL signal testing Two broken lemo connectors at the base, two unplugged lemo cables, one swapped base
- Trigger rates available in epics
- Harp scans show good convergence
- Difficulty starting DAQ (reboot rocPS1)
- Low level monitoring
- Muon chamber light leak fix
- Issues:
- Today's run plan Google Calendar:
- PROGRAM INTERRUPTION
- Shifts on standby (until Saturday Swing? pending further information from MCC)
- PROGRAM INTERRUPTION
- Reports (?):
- Standing issues:
- Weekend meeting?
Thursday, February 8
- Notes from the previous 24 hours:
- 30 minutes of raw mode data
- 4 hours Low intensity running with min bias trigger trigger rate
- TAGM columns fixed during opportunistic access, board swap, parameters changed
- TAGH time and time with respect to the main trigger OK
- Harp scans show good convergence
- Low level monitoring
- surpassed 40 billion triggers
- Issues:
- What goal/expectation should we express to MCC?
- Today's run plan Google Calendar:
- Beam will be taken to steer the injector to make A and C beams colinear
- Opportunistic access for FCAL bases and to retrieve microscope preamp
- Beam will be taken to steer the injector to make A and C beams colinear
- Reports (?):
- Initial TPOL results are available. More work needed, ~3% statistical uncertainties, poor chi2
- Rate evolution
- Standing issues: