== Tuesday, February 13 ==
 +
# Notes from the previous 24 hours:
 +
#* No beam since Friday
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3531251 Beam is over-focused in Y] leading to [https://logbooks.jlab.org/entry/3531226 ~15 % lower transmission], [https://logbooks.jlab.org/entry/3531216 2]
 +
#* [https://logbooks.jlab.org/entry/3531144 Position at dump is 4 mm different in X], [https://logbooks.jlab.org/entry/3531183 2]
 +
#* [https://logbooks.jlab.org/entry/3531116 Goni vertical stage tripped] should reboot controller
 +
#* DAQ problems overnight, about 1 hour lost.
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York  Google Calendar]:
 +
#* Production
 +
# Reports (?):
 +
# Standing issues:
  
 
== Monday, February 12 ==
 
== Monday, February 12 ==
Line 15: Line 27:
 
# Reports (?):
 
# Reports (?):
 
# Standing issues:
 
# Standing issues:
 
 
 
 
  
 
== Friday, February 9 ==
 
== Friday, February 9 ==

Revision as of 09:33, 13 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Tuesday, February 13

  1. Notes from the previous 24 hours:
    • No beam since Friday
  2. Issues:
  3. Today's run plan Google Calendar:
    • Production
  4. Reports (?):
  5. Standing issues:

Monday, February 12

  1. Notes from the previous 24 hours:
    • No beam since Friday
  2. Issues:
  3. Today's run plan Google Calendar:
    • Production
  4. Reports (?):
  5. Standing issues:

Friday, February 9

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Today's run plan Google Calendar:
    • PROGRAM INTERRUPTION
      • Shifts on standby (until Saturday Swing? pending further information from MCC)
  4. Reports (?):
  5. Standing issues:
    • Weekend meeting?



Thursday, February 8

  1. Notes from the previous 24 hours:
  2. Issues:
    • What goal/expectation should we express to MCC?
  3. Today's run plan Google Calendar:
    • Beam will be taken to steer the injector to make A and C beams colinear
      • Opportunistic access for FCAL bases and to retrieve microscope preamp
  4. Reports (?):
  5. Standing issues: