== Tuesday, February 13 == | == Tuesday, February 13 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | #* | + | #* Beam returned on Owl |
# Issues: | # Issues: | ||
#* [https://logbooks.jlab.org/entry/3531251 Beam is over-focused in Y] leading to [https://logbooks.jlab.org/entry/3531226 ~15 % lower transmission], [https://logbooks.jlab.org/entry/3531216 2] | #* [https://logbooks.jlab.org/entry/3531251 Beam is over-focused in Y] leading to [https://logbooks.jlab.org/entry/3531226 ~15 % lower transmission], [https://logbooks.jlab.org/entry/3531216 2] |
Revision as of 09:45, 13 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Tuesday, February 13
- Notes from the previous 24 hours:
- Beam returned on Owl
- Issues:
- Beam is over-focused in Y leading to ~15 % lower transmission, 2
- Position at dump is 4 mm different in X, tagger tripped Feb. 11th 22:41 and field is 0.15% lower
- Goni vertical stage tripped should reboot controller
- DAQ problems overnight, about 1 hour lost.
- Today's run plan Google Calendar:
- Production
- Reports (?):
- Standing issues:
Monday, February 12
- Notes from the previous 24 hours:
- No beam since Friday
- Issues:
- Today's run plan Google Calendar:
- Production
- Reports (?):
- Standing issues:
Friday, February 9
- Notes from the previous 24 hours:
- Rapid Access Approved! Collimator cave excluded.
- FCAL signal testing Two broken lemo connectors at the base, two unplugged lemo cables, one swapped base
- Trigger rates available in epics
- Harp scans show good convergence
- Difficulty starting DAQ (reboot rocPS1)
- Low level monitoring
- Muon chamber light leak fix
- Issues:
- Today's run plan Google Calendar:
- PROGRAM INTERRUPTION
- Shifts on standby (until Saturday Swing? pending further information from MCC)
- PROGRAM INTERRUPTION
- Reports (?):
- Standing issues:
- Weekend meeting?
Thursday, February 8
- Notes from the previous 24 hours:
- 30 minutes of raw mode data
- 4 hours Low intensity running with min bias trigger trigger rate
- TAGM columns fixed during opportunistic access, board swap, parameters changed
- TAGH time and time with respect to the main trigger OK
- Harp scans show good convergence
- Low level monitoring
- surpassed 40 billion triggers
- Issues:
- What goal/expectation should we express to MCC?
- Today's run plan Google Calendar:
- Beam will be taken to steer the injector to make A and C beams colinear
- Opportunistic access for FCAL bases and to retrieve microscope preamp
- Beam will be taken to steer the injector to make A and C beams colinear
- Reports (?):
- Initial TPOL results are available. More work needed, ~3% statistical uncertainties, poor chi2
- Rate evolution
- Standing issues: