Line 4: Line 4:
 
* [http://calendar.google.com Edit Runplan google calendar]
 
* [http://calendar.google.com Edit Runplan google calendar]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
 +
 +
 +
==Wednesday, February  15==
 +
# Accelerator Status
 +
#* Maintenance and RF recovery complete
 +
#* Beam very stable overnight [https://logbooks.jlab.org/entry/3458575]
 +
# Hall-D/GlueX items
 +
#*  Running last 24 hours
 +
#** ABU: 7 hours (401+172)
 +
#** BANU: 0.75 hours (14+28)
 +
#* Access:
 +
#** FCAL: 16 bases and 2 PMTs replaced[https://logbooks.jlab.org/entry/3458358]
 +
#** BPU: 1 mm lead radiator installed [https://logbooks.jlab.org/entry/3458236]
 +
#** Collimator: 1mm insert placed in 3.4 mm hole [https://logbooks.jlab.org/entry/3458229]
 +
#* Analysis of old harp scan data suggests beam size at collimator is < 0.5 mm  [https://logbooks.jlab.org/entry/3458258] ( within spec [https://halldweb.jlab.org/wiki/index.php/Specification_for_12_GeV_electron_beam_and_associated_instrumentation] )
 +
#* Harp scans [https://logbooks.jlab.org/entry/3458473][https://logbooks.jlab.org/entry/3458476]
 +
#** Communication issue between PD, RC, SL and MCC.  Todd's script should have been run but instead the operator tweaked by hand.
 +
#* DAQ issues overnight [https://logbooks.jlab.org/entry/3458549][https://logbooks.jlab.org/entry/3458518]
 +
#** When DAQ crashes, shift crew should try to take a screenshot of the yellow text windows.
 +
# Monitoring
 +
#* Low Level [https://logbooks.jlab.org/entry/3458577 report]
 +
#** Changes: CDC boundaries; New hits per detector plots; New amo run normalization; phi vs theta; TDC-ADC for all detectors; Trigger bit fractions;
 +
#* High level
 +
# Run Plan
 +
#* Production
 +
#* Trigger efficiency studies (2 hours) Wednesday.
 +
#** Investigate Tagger and SC trigger
 +
#* Thursday: magnetic -> RF separation.  Check beam quality
 +
#** Radiation measurements without radiator
 +
#** Beam noise measurement on beam profiler with low current
 +
#** Harp scans
 +
#* If there's a Solenoid trip: TAC run and no field track measurement
 +
# Offline Analysis?
 +
# Any Other Business?
 +
#* BCAL LED studies>  Sasha reports that nothing abnormal was observed.
 +
#* FCAL gain matching voltage change.  Please present proposal at one of the RC meetings.
 +
 +
==Tuesday, February  14==
 +
# Accelerator Status
 +
#* 31 hours without beam, and counting.  LCW tripped off but no alarms due to a bad flow meter.  Temperature sensors tripped off the magnets.  Suspected short in magnet on recovery, repaired with insulation. 
 +
# Hall-D/GlueX items
 +
#* Coherent edge [https://logbooks.jlab.org/entry/3458016]
 +
#* Monday opportunistic access: cable was run [https://logbooks.jlab.org/entry/3457988], collimator insert fits [https://logbooks.jlab.org/entry/3457986]
 +
# Run Plan
 +
#* Tuesday Access
 +
#** Sergei: TRD radiator change
 +
#** Adesh + John: FCAL bases tests
 +
#** Insert 1 mm Collimator insert
 +
#** Change beam profiler radiator to 1 mm lead.
 +
#** Tom: Adjust PSpec magnet PS rheostat
 +
#** Alex Deur: Tagger hall
 +
#* When beam returns
 +
#** Harp scan and Todd's script if necessary.
 +
#** Empty target run.  1 hour.  100 nA with diamond.
 +
#** Production
 +
#* Trigger efficiency studies (2 hours) Wednesday.
 +
#** Investigate Tagger and SC trigger
 +
#* Thursday: magnetic -> RF separation.  Check beam quality
 +
#** Radiation measurements without radiator
 +
#** Beam noise measurement on beam profiler with low current
 +
#** Harp scans
 +
#* If there's a Solenoid trip: TAC run and no field track measurement
 +
# Offline Analysis?
 +
#* Beam energy [https://logbooks.jlab.org/entry/3457959]
 +
# Any Other Business?
 +
 +
==Monday, February  13==
 +
# Accelerator Status
 +
#* Mostly smooth running over the weekend
 +
#** Cryogenics problems Monday Owl
 +
# Hall-D/GlueX items
 +
#*  Running last 48 hours
 +
#** ABU: 31 hours (371+339+279+380+367+122)
 +
#** BANU: 5 hours (27+65+126+13+59+15)
 +
#** Triggers:  12 billion reached [https://logbooks.jlab.org/entry/3457904]
 +
#*** How many are hadronic in the coherent peak? 
 +
#* Auto CO2 bottle changeover didn't happen [https://logbooks.jlab.org/entry/3457679] [https://logbooks.jlab.org/entry/3457735]
 +
#** New valve purchased.  Bottle will be changed preemptively in future.
 +
#* Nitrogen valve issue [https://logbooks.jlab.org/entry/3457714] [https://logbooks.jlab.org/entry/3457740]
 +
#** This was a controls issue, not quite clear. Under investigation.
 +
#* Rates vary with diamond orientations [https://logbooks.jlab.org/entry/3457757] [https://logbooks.jlab.org/entry/3457790]
 +
#** Evidence suggests this is low energy stuff.  Seems like it will cancel to first order in PARA to PERP for both settings.
 +
#* Solenoid power supply transistor light persists [https://logbooks.jlab.org/entry/3457513] [https://logbooks.jlab.org/entry/3457753]
 +
#** Not a problem.  Instruct shift crew to ignore this.
 +
#* DAQ disconnection [https://logbooks.jlab.org/entry/3457802]
 +
#** Memory allocation problem solved,
 +
#** network overloaded at certain hours of the day, RC timeout extended to 5 minutes
 +
#** ET system crashes - still mysterious. Under investigation.
 +
# Monitoring
 +
#* Low level
 +
#** [https://logbooks.jlab.org/entry/3457900 Report]
 +
#** Fluctuations in #/trigger [https://halldweb.jlab.org/cgi-bin/data_monitoring/monitoring/plotBrowser.py?run1=30481&run2=30499&plot=HistMacro_PID&ver=rawdata_ver00&period=RunPeriod-2017-01&rcdb_query=@is_production&decending=yes]
 +
#*** Might be a TDC timing offset issue.
 +
#** Beam properties histogram normalization problem? [https://halldweb.jlab.org/cgi-bin/data_monitoring/monitoring/plotBrowser.py?run1=30460&run2=30473&plot=HistMacro_Beam&ver=rawdata_ver00&period=RunPeriod-2017-01&rcdb_query=@is_production&decending=yes ]
 +
#*** Divide to normalize instead of subtract.
 +
#** Histogram changes. [https://halldweb.jlab.org/cgi-bin/data_monitoring/monitoring/plotBrowser.py?run1=30481&run2=30499&plot=HistMacro_Kinematics&ver=rawdata_ver00&period=RunPeriod-2017-01&rcdb_query=@is_production&decending=yes]
 +
#*** Will include Theta vs Phi.
 +
#* High level
 +
# Run Plan
 +
#* Tuesday Access
 +
#** Hovanes + Tom: cable running
 +
#** Sergei: TRD radiator change
 +
#** Adesh: FCAL bases tests
 +
#** Fit check collimator insert
 +
#** Tom: Adjust PSpec magnet PS rheostat
 +
#** Alex D: Tagger hall
 +
#* Production
 +
#* Harp scan every 2 days.  Monday
 +
#* Empty target run.  1 hour.  100 nA with diamond.
 +
#* Trigger efficiency studies (2 hours) Wednesday.
 +
#** Investigate Tagger and SC trigger
 +
#* Raw (Full waveform) run?
 +
#** 10 minutes. 100 nA with diamond
 +
#* If there's a Solenoid trip: TAC run and no field track measurement
 +
# Offline Analysis?
 +
# Any Other Business?
  
 
==Saturday, February  11==
 
==Saturday, February  11==
 
# Accelerator Status
 
# Accelerator Status
#*
+
#* 2 hour down overnight for RF problem, cavity "lost" its parameters somehow.
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 
#*  Running last 24 hours
 
#*  Running last 24 hours
#** ABUs   
+
#** ABUs  15.4 hours
 
#** Triggers   
 
#** Triggers   
#* Harp scans
+
#* [https://logbooks.jlab.org/entry/3457513 Solenoid power supply transistor]
 +
#* Harps scans show divergence in Y https://logbooks.jlab.org/entry/3457448
 +
#** Ask MCC to run Todd's script?  Decide to leave it for now.
 
# Monitoring
 
# Monitoring
 
#* Low level
 
#* Low level
 +
#** Beam properties histogram: the issue was a change in the analysis cuts which applied to the new diamond but needed a new AMO reference
 +
#*** https://logbooks.jlab.org/entry/3457512
 +
#** [https://halldweb.jlab.org/cgi-bin/data_monitoring/monitoring/plotBrowser.py?run1=30436&run2=30449&plot=CDC_occupancy&ver=rawdata_ver00&period=RunPeriod-2017-01&rcdb_query=@is_production&decending=yes Daily]
 
#* High level  
 
#* High level  
# Calibration
+
#** New features are nice
 +
#** Fits will be improved
 +
#** Beta plots need looking into.
 
# Run Plan
 
# Run Plan
 
#* Production
 
#* Production
 +
#* Harp scan every 2 days.  Sunday
 +
#* Empty target run.  Monday
 +
#* Trigger efficiency studies (4 hours) Wednesday
 
# Offline Analysis?
 
# Offline Analysis?
 
#* [https://logbooks.jlab.org/entry/3457220 bg (amorphous) beam polarization from collimator misalignment]
 
#* [https://logbooks.jlab.org/entry/3457220 bg (amorphous) beam polarization from collimator misalignment]

Latest revision as of 10:23, 15 February 2017

<- Back to Run Coordination Meetings: Spring 2017 Run


Wednesday, February 15

  1. Accelerator Status
    • Maintenance and RF recovery complete
    • Beam very stable overnight [1]
  2. Hall-D/GlueX items
    • Running last 24 hours
      • ABU: 7 hours (401+172)
      • BANU: 0.75 hours (14+28)
    • Access:
      • FCAL: 16 bases and 2 PMTs replaced[2]
      • BPU: 1 mm lead radiator installed [3]
      • Collimator: 1mm insert placed in 3.4 mm hole [4]
    • Analysis of old harp scan data suggests beam size at collimator is < 0.5 mm [5] ( within spec [6] )
    • Harp scans [7][8]
      • Communication issue between PD, RC, SL and MCC. Todd's script should have been run but instead the operator tweaked by hand.
    • DAQ issues overnight [9][10]
      • When DAQ crashes, shift crew should try to take a screenshot of the yellow text windows.
  3. Monitoring
    • Low Level report
      • Changes: CDC boundaries; New hits per detector plots; New amo run normalization; phi vs theta; TDC-ADC for all detectors; Trigger bit fractions;
    • High level
  4. Run Plan
    • Production
    • Trigger efficiency studies (2 hours) Wednesday.
      • Investigate Tagger and SC trigger
    • Thursday: magnetic -> RF separation. Check beam quality
      • Radiation measurements without radiator
      • Beam noise measurement on beam profiler with low current
      • Harp scans
    • If there's a Solenoid trip: TAC run and no field track measurement
  5. Offline Analysis?
  6. Any Other Business?
    • BCAL LED studies> Sasha reports that nothing abnormal was observed.
    • FCAL gain matching voltage change. Please present proposal at one of the RC meetings.

Tuesday, February 14

  1. Accelerator Status
    • 31 hours without beam, and counting. LCW tripped off but no alarms due to a bad flow meter. Temperature sensors tripped off the magnets. Suspected short in magnet on recovery, repaired with insulation.
  2. Hall-D/GlueX items
    • Coherent edge [11]
    • Monday opportunistic access: cable was run [12], collimator insert fits [13]
  3. Run Plan
    • Tuesday Access
      • Sergei: TRD radiator change
      • Adesh + John: FCAL bases tests
      • Insert 1 mm Collimator insert
      • Change beam profiler radiator to 1 mm lead.
      • Tom: Adjust PSpec magnet PS rheostat
      • Alex Deur: Tagger hall
    • When beam returns
      • Harp scan and Todd's script if necessary.
      • Empty target run. 1 hour. 100 nA with diamond.
      • Production
    • Trigger efficiency studies (2 hours) Wednesday.
      • Investigate Tagger and SC trigger
    • Thursday: magnetic -> RF separation. Check beam quality
      • Radiation measurements without radiator
      • Beam noise measurement on beam profiler with low current
      • Harp scans
    • If there's a Solenoid trip: TAC run and no field track measurement
  4. Offline Analysis?
  5. Any Other Business?

Monday, February 13

  1. Accelerator Status
    • Mostly smooth running over the weekend
      • Cryogenics problems Monday Owl
  2. Hall-D/GlueX items
    • Running last 48 hours
      • ABU: 31 hours (371+339+279+380+367+122)
      • BANU: 5 hours (27+65+126+13+59+15)
      • Triggers: 12 billion reached [15]
        • How many are hadronic in the coherent peak?
    • Auto CO2 bottle changeover didn't happen [16] [17]
      • New valve purchased. Bottle will be changed preemptively in future.
    • Nitrogen valve issue [18] [19]
      • This was a controls issue, not quite clear. Under investigation.
    • Rates vary with diamond orientations [20] [21]
      • Evidence suggests this is low energy stuff. Seems like it will cancel to first order in PARA to PERP for both settings.
    • Solenoid power supply transistor light persists [22] [23]
      • Not a problem. Instruct shift crew to ignore this.
    • DAQ disconnection [24]
      • Memory allocation problem solved,
      • network overloaded at certain hours of the day, RC timeout extended to 5 minutes
      • ET system crashes - still mysterious. Under investigation.
  3. Monitoring
    • Low level
      • Report
      • Fluctuations in #/trigger [25]
        • Might be a TDC timing offset issue.
      • Beam properties histogram normalization problem? [26]
        • Divide to normalize instead of subtract.
      • Histogram changes. [27]
        • Will include Theta vs Phi.
    • High level
  4. Run Plan
    • Tuesday Access
      • Hovanes + Tom: cable running
      • Sergei: TRD radiator change
      • Adesh: FCAL bases tests
      • Fit check collimator insert
      • Tom: Adjust PSpec magnet PS rheostat
      • Alex D: Tagger hall
    • Production
    • Harp scan every 2 days. Monday
    • Empty target run. 1 hour. 100 nA with diamond.
    • Trigger efficiency studies (2 hours) Wednesday.
      • Investigate Tagger and SC trigger
    • Raw (Full waveform) run?
      • 10 minutes. 100 nA with diamond
    • If there's a Solenoid trip: TAC run and no field track measurement
  5. Offline Analysis?
  6. Any Other Business?

Saturday, February 11

  1. Accelerator Status
    • 2 hour down overnight for RF problem, cavity "lost" its parameters somehow.
  2. Hall-D/GlueX items
  3. Monitoring
    • Low level
    • High level
      • New features are nice
      • Fits will be improved
      • Beta plots need looking into.
  4. Run Plan
    • Production
    • Harp scan every 2 days. Sunday
    • Empty target run. Monday
    • Trigger efficiency studies (4 hours) Wednesday
  5. Offline Analysis?
  6. Any Other Business?

Friday, February 10

  1. Accelerator Status
    • Difficulties on Day Shift and into Swing. Owl smooth
  2. Hall-D/GlueX items
  3. Monitoring
    • Low level
      • New channel out in FCAL; occupancy drift in single PS channel; LED signals still in some histograms, cuts coming; new statistics on some histograms (nice)
    • High level
      • Rho analysis, 30 kHz data before beam focus was tuned
        • https://logbooks.jlab.org/entry/3456928
        • timing calibration seems out; polarizations might not be good because of lack of accidental subtraction; signal to background looks great; 30% lower rho/trigger compared to Spring 2016(should improve with calibration); omega width 50% larger and yield lower by half
  4. Calibration
    • Calibration jobs are on the farm right now, hopefully ready by Sunday/Monday.
  5. Run Plan
    • Production
  6. Offline Analysis?
  7. Any Other Business?

Thursday, February 9

  1. Accelerator Status
    • Slew of difficulties over Owl shift, pathlength drift, electronics problems, BPM problems
  2. Hall-D/GlueX items
    • Running last day
      • ABUs
      • Triggers
    • Coherent Peak Position difference
    • 50 kHz running
      • Smooth running, hodoscope up to 5.7 GeV turned off. Occasional glitches in the DAQ rate due to Java garbage collection (adding a few percent to deadtime.) 900 MB/s
      • What is the data quality? (Normalized to trigger) Physics signals, (omega, rho: # per trigger, widths, backgrounds)
    • Monitoring
      • Low level monitoring coordinator (Thomas): Report every morning.
      • High level monitoring coordinator (Alex): Report every morning.
      • Cut on triggers for monitoring
      • Run DAQ when beam is gone
      • Threshold for alerting experts?
        • Run coordinator should be called for problems that limit data taking
    • Target IOC problem overnight
      • Reboot should be done by shift crew if they know how, otherwise call Deur, then cal Ito.
    • End run script and RCDB entries
  3. Run Plan
    • Align coherent peaks?
    • Production
  4. Offline Analysis?
  5. Any Other Business?