Difference between revisions of "Run Planning Meeting Notes, February 16 - February 22, 2023"

From GlueXWiki
Jump to: navigation, search
(Shift Reports)
(Thursday February 16)
Line 18: Line 18:
 
* [ 0400-1000]
 
* [ 0400-1000]
 
* [ 2200-0400]
 
* [ 2200-0400]
* [ 1600-2200]
+
* [https://logbooks.jlab.org/entry/4131994 1600-2200]
 
* [https://logbooks.jlab.org/entry/4131761 1000-1600]
 
* [https://logbooks.jlab.org/entry/4131761 1000-1600]
 
* [https://logbooks.jlab.org/entry/4131531 0400-1000]
 
* [https://logbooks.jlab.org/entry/4131531 0400-1000]

Revision as of 17:23, 15 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday February 16

Past 24 hours

  • HARP scan results
  • No beam between 9am and 12am (beam came back at midnight)
  • CCAL transported to experimental hall and fixed to its platform by Scot and his team

Shift Reports

Reports

Issues

Pending:

  • Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
  • BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM.

Plans

  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)