Difference between revisions of "Run Planning Meeting Notes, February 16 - February 22, 2023"

From GlueXWiki
Jump to: navigation, search
(Reports)
(Reports)
Line 27: Line 27:
 
* [https://logbooks.jlab.org/entry/4132086 Noise on some TPOL channels (Data should be good enough).] (Michael Dugger)
 
* [https://logbooks.jlab.org/entry/4132086 Noise on some TPOL channels (Data should be good enough).] (Michael Dugger)
 
* Statistics balance  
 
* Statistics balance  
**PARA 0/90: 20.7%
+
**PARA 0/90: 21.4%
**PERP 0/90: 20.2%
+
**PERP 0/90: 19.7%
**PARA 45/135: 21.1%
+
**PARA 45/135: 20.5%
**PERP 45/135: 19.7%
+
**PERP 45/135: 20.0%
**AMO : 18.3%
+
**AMO : 18.4%
  
 
=== Issues ===
 
=== Issues ===

Revision as of 08:35, 16 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday February 16

Past 24 hours

  • HARP scan results
  • No beam between 9am and 12am (beam came back at midnight)
  • CCAL transported to experimental hall and fixed to its platform by Scot and his team

Shift Reports

Reports

Issues

Pending:

Plans

  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)