=== Reports ===
 
=== Reports ===
[https://logbooks.jlab.org/entry/4102104 Please don't prestart very early] (Naomi)
+
* [https://logbooks.jlab.org/entry/4102104 Please don't prestart very early] (Naomi)
 +
* [https://logbooks.jlab.org/entry/4132522 TAGM scaler issue resolved] (Hovanes)
 
* Statistics balance  
 
* Statistics balance  
 
**PARA 0/90: 20.9%
 
**PARA 0/90: 20.9%
Line 34: Line 35:
 
* [https://logbooks.jlab.org/entry/4132129 HallD Run #120726: LED ADC reference SiPM time anomaly]
 
* [https://logbooks.jlab.org/entry/4132129 HallD Run #120726: LED ADC reference SiPM time anomaly]
 
Pending:
 
Pending:
* [https://logbooks.jlab.org/entry/4131558 TAGM discriminator TRG scaler gone wild]
 
 
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking.
 
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking.
 
* BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)
 
* BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)

Revision as of 10:47, 16 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Friday February 17

Past 24 hours

  • Mark D. replaced the bad BCAL HV board with a new one at XX:XX.

Shift Reports

Reports

Issues

Pending:

  • Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
  • BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)

Plans

  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday February 16

Past 24 hours

  • Production runs with a stable beam.
  • 2 BCAL HVs have been off since midnight due to a bad voltage board.

Shift Reports

Reports

Issues

Pending:

Plans

  • A bad BCAL HV board should be changed. Chris Stanislav is out today, and Mark D. is trying to find someone to change the BCAL board.
  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)