=== Reports ===
 +
* [https://logbooks.jlab.org/entry/4132530 BCAL HV board changed] [https://logbooks.jlab.org/entry/4132613] [https://logbooks.jlab.org/entry/4132636] (Mark)
 +
* [https://logbooks.jlab.org/entry/4132557 Several works done in the hall during day-shift downtime]
 +
** IOC for chiller issue --> Fixed by Josh, Scot, and Bobb.
 +
** BCAL chiller alarm --> Fixed by Hovanes.
 +
** DIRC FPGA communication errors, DAQ issues (not communicating with most of ROCs) --> Fixed by Sergey.
 +
** Sasha and Vlad entered the hall for the calorimeter work.
 +
* [https://logbooks.jlab.org/entry/4132736 Higher occupancy in FDC] -> [https://logbooks.jlab.org/entry/4133053 Efficiency looks OK.] (Lubomir)
 +
* Statistics balance
 +
**PARA 0/90: 20.8%
 +
**PERP 0/90: 20.0%
 +
**PARA 45/135: 21.1%
 +
**PERP 45/135: 20.7%
 +
**AMO : 17.3%
 +
 +
=== Issues ===
 +
Pending:
 +
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking.
 +
* BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)
 +
 +
=== Plans ===
 +
* On Monday, Sasha and Chris are planning to work in the hall (?)
 +
* Install CCAL whenever there is an extended accelerator downtime
 +
** Restricted Access is needed to be able to use the ramp <-done
 +
** Cabling
 +
** Survey is needed
 +
* Production (300 nA, 2h runs) with cycle:
 +
**2 runs PARA (0/90)
 +
**2 runs PERP (0/90)
 +
**2 runs PARA (45/135)
 +
**2 runs PERP (45/135)
 +
**1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
 +
  
 
= Friday February 17 =
 
= Friday February 17 =

Revision as of 19:18, 17 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Monday February 20

Past 72 hours

  • Production on diamond. ABU= XX h for the weekend. (XX h Friday , XX h Saturday, XX Sunday)

Shift Reports Friday

Shift Reports Saturday

  • [ Day shift summary]
  • [ Swing shift summary]
  • [ Owl shift summary]
  • [ Early Riser shift summary]

Shift Reports Sunday

  • [ Day shift summary]
  • [ Swing shift summary]
  • [ Owl shift summary]
  • [ Early Riser shift summary]

Reports

Issues

Pending:

  • Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
  • BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)

Plans

  • On Monday, Sasha and Chris are planning to work in the hall (?)
  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)


Friday February 17

Past 24 hours

  • Mark D. replaced the bad BCAL HV board with a new one at 9:40am.
  • No beam from 13:00 to 17:30 (0L40 cryo issue). Several people worked in the hall during this downtime.
  • Production runs resumed after beam came back.

Shift Reports

Reports

Issues

Pending:

  • Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
  • BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)

Plans

  • On Monday, Sasha and Chris are planning to work in the hall (?)
  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday February 16

Past 24 hours

  • Production runs with a stable beam.
  • 2 BCAL HVs have been off since midnight due to a bad voltage board.

Shift Reports

Reports

Issues

Pending:

Plans

  • A bad BCAL HV board should be changed. Chris Stanislav is out today, and Mark D. is trying to find someone to change the BCAL board.
  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)