Difference between revisions of "Run Planning Meeting Notes, February 16 - February 22, 2023"

From GlueXWiki
Jump to: navigation, search
(Shift Reports Saturday)
(Shift Reports Saturday)
Line 22: Line 22:
 
* [https://logbooks.jlab.org/entry/4133952 Day shift summary]
 
* [https://logbooks.jlab.org/entry/4133952 Day shift summary]
 
* [https://logbooks.jlab.org/entry/4134082 Swing shift summary]
 
* [https://logbooks.jlab.org/entry/4134082 Swing shift summary]
* [ Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4134308 Owl shift summary]
* [ Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4134418 Early Riser shift summary]
  
 
=== Shift Reports Sunday===
 
=== Shift Reports Sunday===

Revision as of 09:47, 19 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Monday February 20

Past 72 hours

  • Production on diamond. ABU= XX h for the weekend. (XX h Friday , XX h Saturday, XX Sunday)

Shift Reports Friday

Shift Reports Saturday

Shift Reports Sunday

  • [ Day shift summary]
  • [ Swing shift summary]
  • [ Owl shift summary]
  • [ Early Riser shift summary]

Reports

Issues

Pending:

  • Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
  • BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)

Plans

  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Friday February 17

Past 24 hours

  • Mark D. replaced the bad BCAL HV board with a new one at 9:40am.
  • No beam from 13:00 to 17:30 (0L40 cryo issue). Several people worked in the hall during this downtime.
  • Production runs resumed after beam came back.

Shift Reports

Reports

Issues

Pending:

  • Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
  • BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM. (~30 mins?)

Plans

  • On Monday, Sasha and Chris are planning to work in the hall (?)
  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday February 16

Past 24 hours

  • Production runs with a stable beam.
  • 2 BCAL HVs have been off since midnight due to a bad voltage board.

Shift Reports

Reports

Issues

Pending:

Plans

  • A bad BCAL HV board should be changed. Chris Stanislav is out today, and Mark D. is trying to find someone to change the BCAL board.
  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)