Run Planning Meeting Notes, February 16 - February 22, 2023

From GlueXWiki
Revision as of 10:14, 16 February 2023 by Keigo (Talk | contribs)

Jump to: navigation, search

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Friday February 17

Past 24 hours

  • Mark D. replaced the bad BCAL HV board with a new one at XX:XX.

Shift Reports

Reports

Please don't prestart very early (Naomi)

  • Statistics balance
    • PARA 0/90: 20.9%
    • PERP 0/90: 19.9%
    • PARA 45/135: 20.8%
    • PERP 45/135: 20.4%
    • AMO : 18.1%

Issues

Pending:

Plans

  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday February 16

Past 24 hours

  • Production runs with a stable beam.
  • 2 BCAL HVs have been off since midnight due to a bad voltage board.

Shift Reports

Reports

Issues

Pending:

Plans

  • A bad BCAL HV board should be changed. Chris Stanislav is out today, and Mark D. is trying to find someone to change the BCAL board.
  • Install CCAL whenever there is an extended accelerator downtime
    • Restricted Access is needed to be able to use the ramp <-done
    • Cabling
    • Survey is needed
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)