=== Issues === | === Issues === | ||
+ | * Quality of coherent peak? Compare [https://logbooks.jlab.org/entry/4131776] from 2/15 and [https://logbooks.jlab.org/entry/4136910] from 2/22. | ||
+ | |||
Pending: | Pending: | ||
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking. | * [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking. |
Revision as of 19:49, 22 February 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Thursday February 23
Past 24 hours
- Production runs
Shift Reports
Reports
Issues
Pending:
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- TAGH hot channels w/ no beam
- Noise in FDC2 (Lubomir)
- FCAL11 crate problems (Sergey)
- Network port on the fan tray for FCAL11 crate is not working. When we have an expected long downtime, this tray should be replaced (Chris Stanislav).