Difference between revisions of "Run Planning Meeting Notes, February 23 - February 28, 2023"
From GlueXWiki
m (→Reports) |
(→Reports) |
||
Line 18: | Line 18: | ||
=== Reports === | === Reports === | ||
* New prototype in PS test stand: [https://logbooks.jlab.org/entry/4136933] (Sasha) | * New prototype in PS test stand: [https://logbooks.jlab.org/entry/4136933] (Sasha) | ||
+ | * CCAL ready for installation: [https://logbooks.jlab.org/entry/4136944] (Sasha) | ||
=== Issues === | === Issues === |
Revision as of 20:40, 22 February 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Thursday February 23
Past 24 hours
- Production runs
Shift Reports
Reports
Issues
Pending:
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- TAGH hot channels w/ no beam
- Noise in FDC2 (Lubomir)
- FCAL11 crate problems (Sergey)
- Network port on the fan tray for FCAL11 crate is not working. When we have an expected long downtime, this tray should be replaced (Chris Stanislav).