Difference between revisions of "Run Planning Meeting Notes, February 23 - February 28, 2023"

From GlueXWiki
Jump to: navigation, search
(Reports)
m (Past 24 hours)
Line 13: Line 13:
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 
* Production runs
 
* Production runs
 +
* Cosmic run in raw mode when beam was down:
  
 
=== Shift Reports ===
 
=== Shift Reports ===

Revision as of 20:41, 22 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday February 23

Past 24 hours

  • Production runs
  • Cosmic run in raw mode when beam was down:

Shift Reports

Reports

  • New prototype in PS test stand: [1] (Sasha)
  • CCAL ready for installation: [2] (Sasha)

Issues

  • Quality of coherent peak? Compare [3] from 2/15 and [4] from 2/22.

Pending:

Plans