(Thursday February 23)
(Issues)
Line 24: Line 24:
 
* Quality of coherent peak?  Compare [https://logbooks.jlab.org/entry/4131776] from 2/15 and [https://logbooks.jlab.org/entry/4136910] from 2/22.
 
* Quality of coherent peak?  Compare [https://logbooks.jlab.org/entry/4131776] from 2/15 and [https://logbooks.jlab.org/entry/4136910] from 2/22.
  
Pending:
+
*Pending:
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking.
+
** [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking.
* [https://logbooks.jlab.org/entry/4133378 TAGH hot channels w/ no beam]
+
** [https://logbooks.jlab.org/entry/4133378 TAGH hot channels w/ no beam]
* [https://logbooks.jlab.org/entry/4133666 Noise in FDC2] (Lubomir)
+
** [https://logbooks.jlab.org/entry/4133666 Noise in FDC2] (Lubomir)
* [https://logbooks.jlab.org/entry/4133998 FCAL11 crate problems] (Sergey)
+
** [https://logbooks.jlab.org/entry/4133998 FCAL11 crate problems] (Sergey)
** Network port on the fan tray for FCAL11 crate is not working. When we have an expected long downtime, this tray should be replaced (Chris Stanislav).
+
  
 
=== Plans ===  
 
=== Plans ===  

Revision as of 20:48, 22 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday February 23

Past 24 hours

  • Production runs
  • Cosmic run in raw mode when beam was down: Run 120800

Shift Reports

Reports

  • New prototype in PS test stand: [1] (Sasha)
  • CCAL ready for installation: [2] (Sasha)

Issues

  • Quality of coherent peak? Compare [3] from 2/15 and [4] from 2/22.

Plans

  • Completion of CCAL installation
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)