Difference between revisions of "Run Planning Meeting Notes, February 23 - February 28, 2023"

From GlueXWiki
Jump to: navigation, search
m (Shift Reports)
m (Issues)
Line 26: Line 26:
  
 
=== Issues ===
 
=== Issues ===
 +
* gluon04 spontaneously rebooted itself...
 
* [https://logbooks.jlab.org/entry/4136669 TAGM waveforms] (Beni)
 
* [https://logbooks.jlab.org/entry/4136669 TAGM waveforms] (Beni)
 
* Quality of coherent peak?  Compare [https://logbooks.jlab.org/entry/4131776] from 2/15 and [https://logbooks.jlab.org/entry/4136910] from 2/22 and another for 45/135 perp: [https://logbooks.jlab.org/entry/4136947]
 
* Quality of coherent peak?  Compare [https://logbooks.jlab.org/entry/4131776] from 2/15 and [https://logbooks.jlab.org/entry/4136910] from 2/22 and another for 45/135 perp: [https://logbooks.jlab.org/entry/4136947]

Revision as of 07:55, 23 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday February 23

Past 24 hours

  • Production runs
  • Cosmic run in raw mode when beam was down: Run 120800

Shift Reports

Early riser Day Swing Owl

Reports

  • New prototype in PS test stand: [1] (Sasha)
  • CCAL ready for installation: [2] (Sasha)

Issues

  • gluon04 spontaneously rebooted itself...
  • TAGM waveforms (Beni)
  • Quality of coherent peak? Compare [3] from 2/15 and [4] from 2/22 and another for 45/135 perp: [5]

Plans

  • Completion of CCAL installation
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)