Difference between revisions of "Run Planning Meeting Notes, February 23 - February 28, 2023"
From GlueXWiki
m (→Issues) |
(→Reports) |
||
Line 24: | Line 24: | ||
* New prototype in PS test stand: [https://logbooks.jlab.org/entry/4136933] (Sasha) | * New prototype in PS test stand: [https://logbooks.jlab.org/entry/4136933] (Sasha) | ||
* CCAL ready for installation: [https://logbooks.jlab.org/entry/4136944] (Sasha) | * CCAL ready for installation: [https://logbooks.jlab.org/entry/4136944] (Sasha) | ||
+ | * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Accumulated statistics] | ||
=== Issues === | === Issues === |
Revision as of 07:57, 23 February 2023
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Thursday February 23
Past 24 hours
- Production runs
- Cosmic run in raw mode when beam was down: Run 120800
Shift Reports
Reports
- New prototype in PS test stand: [1] (Sasha)
- CCAL ready for installation: [2] (Sasha)
- Accumulated statistics
Issues
- gluon04 spontaneously rebooted itself...
- TAGM waveforms (Beni)
- Quality of coherent peak? Compare [3] from 2/15 and [4] from 2/22 and another for 45/135 perp: [5]
- Pending:
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- TAGH hot channels w/ no beam
- Noise in FDC2 (Lubomir)
- FCAL11 crate problems (Sergey)
Plans
- Completion of CCAL installation
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)