= Friday February 24 =
 +
 +
=== Past 24 hours ===
 +
* Production runs
 +
 +
=== Shift Reports ===
 +
[https://logbooks.jlab.org/entry/4137188 Early riser]
 +
[https://logbooks.jlab.org/entry/4137394 Day]
 +
 +
=== Reports ===
 +
 +
[https://logbooks.jlab.org/entry/4137324 Two FCAL bases replaced] (Mark D.)
 +
 +
== Issues ===
 +
 +
 +
*Pending:
 +
** [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking.
 +
** [https://logbooks.jlab.org/entry/4133378 TAGH hot channels w/ no beam]
 +
** [https://logbooks.jlab.org/entry/4133666 Noise in FDC2] (Lubomir)
 +
** [https://logbooks.jlab.org/entry/4133998 FCAL11 crate problems] (Sergey)
 +
 +
=== Plans ===
 +
* Completion of CCAL installation
 +
*Production (300 nA, 2h runs) with cycle:
 +
**2 runs PARA (0/90)
 +
**2 runs PERP (0/90)
 +
**2 runs PARA (45/135)
 +
**2 runs PERP (45/135)
 +
**1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
 +
  
 
= Thursday February 23 =
 
= Thursday February 23 =

Revision as of 14:25, 23 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Friday February 24

Past 24 hours

  • Production runs

Shift Reports

Early riser Day

Reports

Two FCAL bases replaced (Mark D.)

Issues =

Plans

  • Completion of CCAL installation
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)


Thursday February 23

Past 24 hours

  • Production runs
  • Cosmic run in raw mode when beam was down: Run 120800

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Completion of CCAL installation: possible during MCC work in NL tomorrow morning ~8:30 for about an hour.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)