Difference between revisions of "Run Planning Meeting Notes, February 23 - February 28, 2023"

From GlueXWiki
Jump to: navigation, search
m (Issues)
(Shift Reports)
Line 18: Line 18:
 
[https://logbooks.jlab.org/entry/4139451 Day]
 
[https://logbooks.jlab.org/entry/4139451 Day]
 
[https://logbooks.jlab.org/entry/4139629 Swing]
 
[https://logbooks.jlab.org/entry/4139629 Swing]
 +
[https://logbooks.jlab.org/entry/4139756 Owl]
  
 
=== Issues ===
 
=== Issues ===

Revision as of 23:11, 26 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Monday February 27

Past 24 hours

  • Production runs

Shift Reports

Early riser Day Swing Owl

Issues

Sunday February 26

Past 24 hours

  • Production runs

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Saturday February 25

Past 24 hours

  • Beam came back at about 5:40 am Saturday morning after long downtime due to Hall-D dipole over-temperature trip.

Shift Reports

Early riser Day Swing Owl

Reports

Issues

  • Same pending issues as before...

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Friday February 24

Past 24 hours

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Completion of CCAL installation
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday February 23

Past 24 hours

  • Production runs
  • Cosmic run in raw mode when beam was down: Run 120800

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Completion of CCAL installation: possible during MCC work in NL tomorrow morning ~8:30 for about an hour.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)