(Thursday February 2)
(Blanked the page)
 
(42 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]
 
  
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
 
 
[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=60671503 Spreadsheet with list of runs]
 
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count]
 
 
= Thursday February 2 =
 
=== Past 24 hours ===
 
* Maintenance day, tour of Hall D by EIC review people. Beam is back at midnight.
 
* Harp scans look OK [https://logbooks.jlab.org/entry/4122117]
 
* Production on diamond. ABU= 2.9h for the day.
 
 
=== Shift Reports ===
 
* [https://logbooks.jlab.org/entry/4121686 Day shift summary]
 
* [https://logbooks.jlab.org/entry/4121890 Swing shift summary]
 
* [https://logbooks.jlab.org/entry/4122055 Owl shift summary]
 
* [https://logbooks.jlab.org/entry/4122252 Early Riser shift summary]
 
 
=== Reports ===
 
* [https://logbooks.jlab.org/entry/4121698 HVB current during HV scans] (Naomi).
 
* [https://logbooks.jlab.org/entry/4122018 CDC HVB current vs beam current using this morning's scan] (Naomi).
 
* [https://logbooks.jlab.org/entry/4122025 Current limits and rough estimates of safe HV] (Naomi).
 
* [https://logbooks.jlab.org/entry/4121702 Translation table updated for TAGM] (Justin) .
 
* [https://logbooks.jlab.org/entry/4121789 Swapped HV module for TAGH ch 145 to 168] (Boris).
 
* [https://logbooks.jlab.org/entry/4121989 Attenuation in different materials] (Lubomir).
 
* [https://logbooks.jlab.org/entry/4122324 Transmission has dropped over the night] (Alexandre).
 
* [https://logbooks.jlab.org/entry/4121493 Trigger rates in 2020 and 2023] (Sasha).
 
* [https://logbooks.jlab.org/entry/4122311 High Intensity Foil Absorbers] (Scot).
 
* Remote reset for CAEN chassis (Tim and Bobby).
 
 
 
*GlueX Statistics
 
**PARA 0/90: 16%
 
**PERP 0/90: 19%
 
**PARA 45/135: 20%
 
**PERP 45/135: 18%
 
**AMO : 25%
 
 
=== Issues ===
 
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location.
 
* [https://logbooks.jlab.org/entry/4121311 Reconstructed Photon Beam Energy Spectrum Deep between 10-11 GeV (Churamani)] May be a an issue with timing offset calibrations.
 
 
Pending:
 
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
 
 
=== Plans ===
 
* Wait for stable beam delivery for 4 halls. No timelime can be given.
 
* CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.
 
* Production (300 nA, 2h runs) with cycle:
 
**2 runs para(0/90)
 
**2 runs perp(0/90)
 
**2 runs para(45/135)
 
**2 runs perp(45/135)
 
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 
 
 
 
 
 
 
= Thursday February 3 =
 
=== Past 24 hours ===
 
* Recovery from maintenance day. PSPEC troubleshooting. Test runs. 
 
 
 
=== Shift Reports ===
 
* [https://logbooks.jlab.org/entry/4122399 Day shift summary]
 
* [https://logbooks.jlab.org/entry/4122719 Swing shift summary]
 
* [https://logbooks.jlab.org/entry/4123024 Owl shift summary]
 
* [ Early Riser shift summary]
 
 
=== Reports ===
 
* [https://logbooks.jlab.org/entry/4122571 Power supply trip] (Tim, Scot).
 
* [https://logbooks.jlab.org/entry/4122910 PS magnet at 800A] (Eugene).
 
* [https://logbooks.jlab.org/entry/4122780 ALERT to shift leader: two TAGM columns still at operating Vbias] (Richard).
 
 
 
*GlueX Statistics
 
**PARA 0/90: 16%
 
**PERP 0/90: 19%
 
**PARA 45/135: 20%
 
**PERP 45/135: 18%
 
**AMO : 25%
 
 
=== Issues ===
 
* [https://logbooks.jlab.org/entry/4122848 Pair Spec Magnet Power Supply Flush in morning (Tim)] We need to get PSPEC working at 1200Amps. 
 
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location.
 
* [https://logbooks.jlab.org/entry/4121311 Reconstructed Photon Beam Energy Spectrum Deep between 10-11 GeV (Churamani)] May be a an issue with timing offset calibrations.
 
 
Pending:
 
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
 
 
=== Plans ===
 
* Citra flush PSPEC power supply.
 
* Production (300 nA, 2h runs) with cycle:
 
**2 runs para(0/90)
 
**2 runs perp(0/90)
 
**2 runs para(45/135)
 
**2 runs perp(45/135)
 
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 

Latest revision as of 10:36, 8 February 2023