(Issues)
(Reports)
Line 23: Line 23:
 
* [https://logbooks.jlab.org/entry/4121702 Translation table updated for TAGM] (Justin)  
 
* [https://logbooks.jlab.org/entry/4121702 Translation table updated for TAGM] (Justin)  
 
* [https://logbooks.jlab.org/entry/4121789 Swapped HV module for TAGH ch 145 to 168] (Boris)
 
* [https://logbooks.jlab.org/entry/4121789 Swapped HV module for TAGH ch 145 to 168] (Boris)
* [https://logbooks.jlab.org/entry/4121989 attenuation in different materials] (Lubomir)
+
* [https://logbooks.jlab.org/entry/4121989 Attenuation in different materials] (Lubomir)
 
* [https://logbooks.jlab.org/entry/4121493 Trigger rates in 2020 and 2023] (Sasha)
 
* [https://logbooks.jlab.org/entry/4121493 Trigger rates in 2020 and 2023] (Sasha)
 
* Remote reset for CAEN chassis (Tim and Bobby)
 
* Remote reset for CAEN chassis (Tim and Bobby)

Revision as of 21:31, 1 February 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday February 2

Past 24 hours

  • Maintenance day, tour of Hall D by EIC review people.
  • Harp scans []
  • Production on diamond. ABU= ?? h for the day.

Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: %
    • PERP 0/90: %
    • PARA 45/135: %
    • PERP 45/135: %
    • AMO : %

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)