Difference between revisions of "Run Planning Meeting Notes, February 2 - February 9, 2023"

From GlueXWiki
Jump to: navigation, search
(Past 24 hours)
(Shift Reports)
Line 16: Line 16:
 
* [https://logbooks.jlab.org/entry/4121686 Day shift summary]
 
* [https://logbooks.jlab.org/entry/4121686 Day shift summary]
 
* [https://logbooks.jlab.org/entry/4121890 Swing shift summary]
 
* [https://logbooks.jlab.org/entry/4121890 Swing shift summary]
* [ Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4122055 Owl shift summary]
* [ Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4122252 Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===

Revision as of 11:30, 2 February 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday February 2

Past 24 hours

  • Maintenance day, tour of Hall D by EIC review people. Beam is back at midnight.
  • Harp scans look OK [1]
  • Production on diamond. ABU= 2.9h for the day.

Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: 16%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 18%
    • AMO : 25%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Wait for stable beam delivery for 4 halls. No timelime can be given.
  • CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)