Difference between revisions of "Run Planning Meeting Notes, February 2 - February 9, 2023"

From GlueXWiki
Jump to: navigation, search
(Shift Reports)
(Thursday February 2)
Line 49: Line 49:
 
* Wait for stable beam delivery for 4 halls. No timelime can be given.
 
* Wait for stable beam delivery for 4 halls. No timelime can be given.
 
* CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.  
 
* CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.  
 +
* Production (300 nA, 2h runs) with cycle:
 +
**2 runs para(0/90)
 +
**2 runs perp(0/90)
 +
**2 runs para(45/135)
 +
**2 runs perp(45/135)
 +
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 +
 +
 +
 +
 +
 +
 +
= Thursday February 3 =
 +
=== Past 24 hours ===
 +
* Recovery from maintenance day. PSPEC troubleshooting. Test runs. 
 +
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4122399 Day shift summary]
 +
* [https://logbooks.jlab.org/entry/4122719 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4123024 Owl shift summary]
 +
* [ Early Riser shift summary]
 +
 +
=== Reports ===
 +
* [https://logbooks.jlab.org/entry/4122571 Power supply trip] (Tim, Scot).
 +
* [https://logbooks.jlab.org/entry/4122910 PS magnet at 800A] (Eugene).
 +
* [https://logbooks.jlab.org/entry/4122780 ALERT to shift leader: two TAGM columns still at operating Vbias] (Richard).
 +
 +
 +
*GlueX Statistics
 +
**PARA 0/90: 16%
 +
**PERP 0/90: 19%
 +
**PARA 45/135: 20%
 +
**PERP 45/135: 18%
 +
**AMO : 25%
 +
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4122848 Pair Spec Magnet Power Supply Flush in morning (Tim)] We need to get PSPEC working at 1200Amps. 
 +
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location.
 +
* [https://logbooks.jlab.org/entry/4121311 Reconstructed Photon Beam Energy Spectrum Deep between 10-11 GeV (Churamani)] May be a an issue with timing offset calibrations.
 +
 +
Pending:
 +
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
 +
 +
=== Plans ===
 +
* Citra flush PSPEC power supply.
 
* Production (300 nA, 2h runs) with cycle:
 
* Production (300 nA, 2h runs) with cycle:
 
**2 runs para(0/90)
 
**2 runs para(0/90)

Revision as of 00:39, 3 February 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday February 2

Past 24 hours

  • Maintenance day, tour of Hall D by EIC review people. Beam is back at midnight.
  • Harp scans look OK [1]
  • Production on diamond. ABU= 2.9h for the day.

Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: 16%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 18%
    • AMO : 25%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Wait for stable beam delivery for 4 halls. No timelime can be given.
  • CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)




Thursday February 3

Past 24 hours

  • Recovery from maintenance day. PSPEC troubleshooting. Test runs.


Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: 16%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 18%
    • AMO : 25%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Citra flush PSPEC power supply.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)