Difference between revisions of "Run Planning Meeting Notes, February 2 - February 9, 2023"

From GlueXWiki
Jump to: navigation, search
(Thursday February 5)
(Reports)
Line 28: Line 28:
  
 
=== Reports ===
 
=== Reports ===
* [https://logbooks.jlab.org/entry/4122571 Power supply trip] (Tim, Scot).
+
* [https://logbooks.jlab.org/entry/4123440 PSPEC power supply fixed] (Scot).
* [https://logbooks.jlab.org/entry/4122910 PS magnet at 800A] (Eugene).
+
* [https://logbooks.jlab.org/entry/4123451 Pair Spec Magnet Power Supply Cooling Water Flow] (Tim).
* [https://logbooks.jlab.org/entry/4122780 ALERT to shift leader: two TAGM columns still at operating Vbias] (Richard).
+
* [https://logbooks.jlab.org/entry/4123566 CDC currents during the high intensity scan] (Naomi).
* [https://logbooks.jlab.org/entry/4122719 Current scan to 950nA] (Lubomir)
+
* [https://logbooks.jlab.org/entry/4123985 DIRC South OB humidity tripped interlock] (Justin).
* [https://logbooks.jlab.org/entry/4123280 PSPEC current scan] (Sasha)
+
* [https://logbooks.jlab.org/entry/4124146 DIRC nitrogen flow alarm tripped frequently] (Hao Li).
+
* [https://logbooks.jlab.org/entry/4124254 Target Overtemperature] (Chris, Tim).
 +
* [https://logbooks.jlab.org/entry/4124532 FCAL HV scan results of 29/01/2023] (Igal).
  
 
*GlueX Statistics  
 
*GlueX Statistics  

Revision as of 21:39, 5 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Thursday February 5

Past 72 hours

  • Fixed PSPEC power supply. Production data taking. Dipole magnet failure in the accelerator resulting in shift cancelations.
  • ABU ~20.0h .

Shift Reports

Friday

Saturday


Reports

  • GlueX Statistics
    • PARA 0/90: 16=17%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 19%
    • AMO : 25%

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Citra flush PSPEC power supply. Go to beam permit today.
  • Run production over weekend.
  • High current test with RADCON on Monday
  • RF recovery on Tuesday. Try to raise Hall A & C currents on Wednesday and possibly Thursday.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Thursday February 3

Past 24 hours

  • Recovery from maintenance day. A couple of production runs. PSPEC troubleshooting. Test runs.
  • ABU ~11.2h based on Beni's text messages.

Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: 16%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 19%
    • AMO : 25%

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Citra flush PSPEC power supply. Go to beam permit today.
  • Run production over weekend.
  • High current test with RADCON on Monday
  • RF recovery on Tuesday. Try to raise Hall A & C currents on Wednesday and possibly Thursday.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Thursday February 2

Past 24 hours

  • Maintenance day, tour of Hall D by EIC review people. Beam is back at midnight.
  • Harp scans look OK [1]
  • Production on diamond. ABU= 2.9h for the day.

Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: 16%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 18%
    • AMO : 25%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Wait for stable beam delivery for 4 halls. No timelime can be given.
  • CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)