= Tuesday February 7 =
 +
 +
=== Past 24 hours ===
 +
* Hall D dipole magnet fixed. Wire scans. Production running. 
 +
* ABU ~??h .
 +
 +
=== Shift Reports ===
 +
* [No Day shift summary]
 +
* [https://logbooks.jlab.org/entry/4125606 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4125742 Owl shift summary]
 +
* [ Early Riser shift summary]
 +
 +
=== Reports ===
 +
* [https://logbooks.jlab.org/entry/4125786 Wire scans extrapolation] (Hovanes).
 +
* [https://logbooks.jlab.org/entry/4125449 Solenoid Power Supply LCW temperatures] (Tim).
 +
* [https://logbooks.jlab.org/entry/4125478 Tagger Magnet NMR and temperature relationship] (Tim).
 +
* [https://logbooks.jlab.org/entry/4125486 Tagger Magnet LCW temperature change minimal over past 6 months] (Tim).
 +
 +
 +
*GlueX Statistics
 +
**PARA 0/90: 16%
 +
**PERP 0/90: 19%
 +
**PARA 45/135: 20%
 +
**PERP 45/135: 19%
 +
**AMO : 25%
 +
 +
=== Issues ===
 +
[https://logbooks.jlab.org/entry/4124203 TPOL hole is back] (Hovanes)
 +
 +
 +
Pending:
 +
* [https://logbooks.jlab.org/entry/4123248 Issues with the TAGH HV module (Sasha)] - Need to replace the board in this slot again, access on Tuesday may not be possible.
 +
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] - We do not understand why there is a mismatch in the software between start counter and tracking.
 +
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
 +
 +
 +
=== Plans ===
 +
* High current test without RADCON ??
 +
* Production (300 nA, 2h runs) with cycle:
 +
**2 runs PARA (0/90)
 +
**2 runs PERP (0/90)
 +
**2 runs PARA (45/135)
 +
**2 runs PERP (45/135)
 +
**1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
 +
  
  

Revision as of 00:44, 7 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Tuesday February 7

Past 24 hours

  • Hall D dipole magnet fixed. Wire scans. Production running.
  • ABU ~??h .

Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: 16%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 19%
    • AMO : 25%

Issues

TPOL hole is back (Hovanes)


Pending:

  • Issues with the TAGH HV module (Sasha) - Need to replace the board in this slot again, access on Tuesday may not be possible.
  • Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.


Plans

  • High current test without RADCON ??
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)


Monday February 6

Past 72 hours

  • Fixed PSPEC power supply. Production data taking. Dipole magnet failure in the accelerator resulting in shift cancelations.
  • ABU ~15.5 h .

Shift Reports

Friday

Saturday


Reports

  • GlueX Statistics
    • PARA 0/90: 17%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 19%
    • AMO : 25%

Issues


Pending:

  • Issues with the TAGH HV module (Sasha) - Need to replace the board in this slot again, probably Tuesday.
  • Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Wait for the magnet fix. Go to beam permit today.
  • High intensity running ???.
  • RF recovery on Tuesday. Try to raise Hall A & C currents on Wednesday and possibly Thursday.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Friday February 3

Past 24 hours

  • Recovery from maintenance day. A couple of production runs. PSPEC troubleshooting. Test runs.
  • ABU ~9.6h .

Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: 16%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 19%
    • AMO : 25%

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Citra flush PSPEC power supply. Go to beam permit today.
  • Run production over weekend.
  • High current test with RADCON on Monday
  • RF recovery on Tuesday. Try to raise Hall A & C currents on Wednesday and possibly Thursday.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday February 2

Past 24 hours

  • Maintenance day, tour of Hall D by EIC review people. Beam is back at midnight.
  • Harp scans look OK [1]
  • Production on diamond. ABU ~1.3 h for the day.

Shift Reports

Reports


  • GlueX Statistics
    • PARA 0/90: 16%
    • PERP 0/90: 19%
    • PARA 45/135: 20%
    • PERP 45/135: 18%
    • AMO : 25%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Wait for stable beam delivery for 4 halls. No timelime can be given.
  • CDC & FDC response studies at high luminosities. May not happen today, depends on 1uA beam delivery to Hall D.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)